Public utilities construction project audit risk research
Author: GengDeQuan
Tutor: ZouTan
School: Jiangxi University of Technology
Course: Project Management
Keywords: Public utilities construction projects Audit risk Risk Assessment Risk countermeasures
CLC: F239.4
Type: Master's thesis
Year: 2011
Downloads: 141
Quote: 0
Read: Download Dissertation
Abstract
|
With the growing demand for social progress and people's material and cultural life in recent years , the government has increased investment in education, medical , health, sports and other public welfare undertakings , tangible improvements in people's lives , resulting in huge economic benefits , environmental and social benefits . Increasing number of construction projects , but the construction project has been completed audit , the analysis found , many projects exist the problem of capital out of control . \How to manage the good taxpayers' money is the great expectations of every taxpayer , is also an important issue placed in front of each audit staff . Government audit responsibility is one of the core issues of the government audit system , the norms of economic responsibility audit , performance audit of the implementation issues , the attribution of the rights of state-owned audit oversight , the results of the audit of the Government Notice problems are solved theoretical and practical issues . Uncontrolled basic construction project audit from the Government-owned public utilities , an objective analysis of the reasons of public utility construction projects audit risk , and proposed the corresponding countermeasures to effectively prevent the construction of public utility project funding for various government departments to develop appropriate rules and regulations provide a reference . Firstly government audit and the audit risk of the related concept ; Second study analysis of the construction of public utility project audit of the status quo ; again use Fuzzy comprehensive evaluation method to establish a model analysis of the construction of public utility project audit risk , and combined with case carried out the practice analysis ; Finally , according to the audit of the status quo and I internship experience in the audit units , targeted control audit risk countermeasures .
|
Related Dissertations
- Health Risk Assessment of a Brownfield Contaminated by Volatile Chlorinated Hydrocarbons and Study on Screening of Remediation Technique,X820.4
- Health-based and Ecological Risk Assessment of Contaminated Sites,X820.4
- The Prediction of Potential Suitable Distributions and Risk Assessment of the Alien Invasive Plant Flaveria Bidentis(L.) in China,S451
- Biotypes of Bemisia Tabaci and Resistance Risk Assessment on B Biotype to Pyriproxyfen in XinJiang,S433
- The Workout of Atmospheric Environmental Risk Prediction Software,TP311.52
- The Heavy Metals Distribution Characteristics and Risky Evaluations of Farmland Soils-Crops Around Different Types of Chemical Industrial Park,X833
- The Research and Construction of Ecological Risk Assessment and Warning Manage System in Typical Oilfield,X826
- Risk Assessment & Spatial Distribution of Soil Nutrients and Heavy Metal in Fenhe Reservoir Surrounding,S158
- Xinzhou Naoyang Event Risk Management,G852.9
- Students' Survival Training risk management theory and empirical research,G807.4
- Mine water inrush investigation Risk Assessment,TD745
- BOT financing risk assessment method based on fault tree study,F283
- Study on Risk Identification and Evaluation of Manufacturing Green Products R & D,F205;F224
- Risk Assessment and Decision of the Railway Cuttings in Southwest Mountain Area,U213.12
- Digital Information Resources System Security Risk Assessment,G353.1
- Research on Project Financing of Coke Terminal in Rizhao Port,F552.7
- Annual Contract Energy Decomposition for Hydropower Plants and Risk Control Study,F224;F426.91
- Research on Power System Static Security Risk Assessment Method,TM732
- Subway construction project risk evaluation methods and criteria for research,U231.3
- Tunnel construction caused damage to the adjacent buildings risk assessment and control,U456.3
- Half the river sub - tunnel through rock contact zone construction risk control,U451.2
CLC: > Economic > Economic planning and management > Audit > Various types of audit
© 2012 www.DissertationTopic.Net Mobile
|