Dissertation > Excellent graduate degree dissertation topics show
Study on the Box-type Two-way Surge Tower’ Effection in Prevention Hammer of Long Distance Water Gravitational Transportation Pipeline System
Author: LiShuJun
Tutor: YangYuSi
School: Chang'an University
Course: Municipal Engineering
Keywords: water transportation by gravity water hammer Pipe bursting Box-type Two-way Surge Tower
CLC: TU991.39
Type: Master's thesis
Year: 2008
Downloads: 85
Quote: 1
Read: Download Dissertation
Abstract
|
With quick development of city constructions and the greatly improvement of people’s living level, more and more large long distance water transfer projects appear, the problem of project tube explosion attracts more and more people’s attention. The anti-explosion technology research of long distance water delivery pipeline system with gravity flow conduits is an important problem in safe operation of pipelines. Therefore, it is necessary to have a further discuss on this problem.In this paper, hydraulic factors of water pipeline tube explosion are detailed to analyzed, the water supply system hydraulic transition calculating basic principle and methods are introduced, mathematical model of computation of water hammer under many Boundary Conditions are established, visualization Program is written in VB language, simulation calculation by using computer.Combination with reality working conditions of Shitouhe reservoir in Xianyang water delivery project and Caofeidian water supply project, in the area with great height difference and complex terrain and geomorphy, analysis calculation and comparison the result for closing valve water hammer of long distance pipe with large caliber and gravity flow conduits pipe are made. Aiming at the problem of large pipeline working pressure and water hammer pressure in long-distance and gravity flow conduits pipelines, the measures for energy suppressor and decompression with grade and the method for prolonging closing time of butterfly valve in the End of Pipe System are put forward. Combination with the pipeline exhaust, technologies and suggestions for prevention and reduction tube explosion caused by not proper hydraulic control are advanced. Combination with water supply project in Fuxin city, comparative research on water hammer protection of cavities collapsing of great fluctuation and large drop gravity flow pipelines, all-new water hammer prevention measures and optimization operating regulation are advanced, have significant effects on preventing too high boost caused by water hammer of cavities collapsing and closing valve water hammer, it is very important for making sure safe operation of water supply project and reducing project cost.The results of this paper not only draw conclusion that is beneficial to operation and management of Pipeline of Shitouhe reservoir project in Xianyang, Caofeidian water supply project, but also have a referenced value on water hammer prevention theory and measures in water supply engineering.
|
Related Dissertations
- Water in oil emulsion of water hit the harmonic the demulsification dynamics analysis and its mechanism,X703
- Oil -in-water type emulsified oil water hammer harmonic LabVIEW Simulation and Experimental Research demulsification,X703
- Improvement of Water Hammer Theory and Associated Calculation,TV136
- The Study on Numerical Simulation of Water Hammer in Long Distance Water Gravitation Transportation Project,TV135
- Small water supply pipe network sudden stopping Hydraulic calculation procedure of transition,TU991.32
- Analysising Complete Characteristic Curves of Pump and Studying of the Impact on Hydraulic Transient of Long-distance, Large-diameter and Level Water-delivery Pipelines,TH38
- Research on the Structure of MWD Rotary Valve Pressure Continuous Wave Generator and the Rotor Force Analysis,TE927
- Study on the Water Hammer Existing in Condensate Water Pipe Network of Styrene Plant,TQ241.21
- Frequency due to water hammer generate flow control mechanism,TH231
- Water Hammer Analysis of Safty Membranes System in High-head Hydropower Station,TV732.51
- Study on Water Hammer Protection using Box Type Two-way Surge Tank in Long Distance Water Pipeline with High-lift and Multi-fluctuation,TU991.39
- Study on Inverse Problems of Hydraulics in Water Diversion Projects,TV135
- Study on Hydraulic Characteristics and Multi-objective Optimization of Surge Tank in a Hydropower Station with Long-distance Diversion Tunnels,TV732.5
- Long-distance Water Pipeline Accident Analysis and Its Key Technology Research,TU991.32
- Distribution system Numerical Simulation of Water Hammer,TV135
- Experimental Study on Water Hammer Protection Using Box Type Two-way Surge Tank in Long Distance Water Pipeline,TV134
- Development and Research of Hydraulic Spray Descaling Designer,TG335
- Numberical Simulation and Visualization Study on Water Hammer,TV134
- Large flow relatively flat long distance pressure water hammer protection of water management,TU991.39
- Study on the Technology of Pressure Pulse Plugging Removal and Numerical Simulation of Its Oscillating Field,TE358
CLC: > Industrial Technology > Building Science > Municipal Engineering > Water supply project ( on the Water Works ) > Water distribution > Water hammer
© 2012 www.DissertationTopic.Net Mobile
|