Dissertation > Excellent graduate degree dissertation topics show
Research on Schedule Control of Engineering Construction in Large-scale Metallurgial Enterprise
Author: FengKeQiang
Tutor: LinWen;GuoHong
School: Chinese Geology University (Beijing)
Course: Industrial Engineering
Keywords: metallurgy construction project process control generalization process index
CLC: F407.3
Type: Master's thesis
Year: 2009
Downloads: 195
Quote: 2
Read: Download Dissertation
Abstract
|
The large-scale metallurgical construction has some features such as strong independent character on other project, complicated engineering structure and the construction technique, constructed by many construction units and long construction period. These features render the large-scale metallurgical construction difficult to conduct effective process management. Nevertheless, the level of its process management has a great influence on the quality of the metallurgical project and the product of the business enterprise. This paper, taking the Baosteel’s 1800mm Cold Rolling Engineering as an example, discussed the process management of the large-scale metallurgical construction.At first, this paper presents an overall introduction to the past and current situation of construction process control of large-scale metallurgical, and the features of large-scale metallurgical project. Some problems are noted in the large-scale metallurgical project construction schedule control and multi-optimization method.Then, this paper discussed a serials significant factor within the process of scheduling for the large-scale metallurgical project, and the Critical Paths of Baosteel’s 1800mm Cold Rolling Engineering was analyzed. Checking the implement of the schedule is also a important part of schedule control, this paper introduce generalization process index and generalization process index curve to check the implement of the schedule, which can make the process controlling more macroscopically and intuitively in the large-scale metallurgical construction.. This paper presents deviation analysis methods for schedule control, analyses the causes of progress deviation as well as the relationship between investment deviation and progress deviation.At last, this paper proposed a model for process control which could be generally applied to large-scale metallurgical projects. In addition, measures including varies of the management of the large-scale metallurgical project are introduced to ensure the success of the process control model.
|
Related Dissertations
- Research and Design of One Kind of Paper’s QCS That Based on Embedded System,TP368.1
- Cost Control of government statistical work,C829.2
- On Key Points of Internal Control of Higher Education,G647
- Research CMLIP project asphalt pavement construction quality and risk control,U415.1
- The Dongqi reconstruction of major projects in the process control,F426.471
- Research on Computer Process Control of Reheat Furnace for Medium Heavy Plate,TG307
- Study of Research on Synthetic Test Rig for Coal Mine Hydraulic Support Operating Valve,TD355.4
- Mathematical Models and Process Control Systerm for 1700mm Cold Mill in Tonggang,TG333
- Program Design and Database Development on Controlled Cooling Platform for Medium and Heavy Plate,TG335
- Study on Process Monitoring Method and Its Application of Reheating Furnace,TG307
- Rolling Process Control and Models’ Study and Application for Rough Stands of Hot Strip Mill,TG335.11
- Development of the Electric Motor Shaft Manufacturing Quality Detection and Control System,TM303.5
- Research for the Generic Quality Control System,TH186
- The Optimization of Organizational Management of Hongqiao District Construction Committee,F426.92
- The Research of Supply Chain Optimization for Auto Parts Manufacturer,F426.471
- Evaluation on Stability of Threshing and Redrying Lamina Structure of Tobacco,TS443
- Research on Quality Improvement for Forgings in Taiyuan Heavy Industry Casting & Forging Subco,TG316
- A Sort of Cumulative Sum Control Charts for Multivariate Fuzzy Data,O213
- Research of Construction Quality Controls on a Agricultural Bank Building,F284
- Research on FAW-VW Subsection Sourcing Management,F426.471
- Study on the Informationization Risk Management of Equipment Manufacturing Enterprises,F426.4
CLC: > Economic > Industrial economy > Industrial economic theory > Industrial sector economy > Metallurgical Industry