|
With the rapid development of the socio-economic needs of the day - to - day work , and improved quality of life , people travel more and more frequently , especially done by road transport in the number of short trips increased dramatically , in the course of travel , the people multiply convenience , safety , and comfort of the vehicles are increasingly high requirements . Currently, the relatively low level of development of the country Bus Terminal , station management , organization, operations are still quite a mess in many parts of just blindly start construction of the Bus Terminal , rather than focus on the good work building the layout of the former station , which is the cause of currently there are contradictions between the key passenger terminal development and people's actual requirements . If this problem can not be solved in time , and the results will not only lead to the loss of passenger traffic , will impede the continued development of the economic, social . Therefore, in order to solve our country before the construction of the Bus Terminal to ignore the status of the station layout , the paper combined with the research status on the basis of a systematic study of our Bus Terminal layout issues and approaches . This thesis, the main problems of Bus Terminal layout as the starting point for how well the layout of the Bus Terminal , are discussed from two aspects of the relationship between the size and the location . First , the concept of the Bus Terminal , functions and main features described ; Secondly, the bus terminal passenger traffic volume determined on the basis of reasonable calculation of the station the size of the facility to determine the configuration of the main station equipment , and organizational planning the station process flow line; Finally , according to the method determined by the location of the principles and requirements of the bus terminal layout and major facilities , good passenger terminal layout , play a guiding role for the construction of the passenger terminal building and after the completion of the operation and management .
|