Dissertation > Excellent graduate degree dissertation topics show
Study on Risk Accessment for Project Equipment Logistics
Author: WangQiong
Tutor: DongMing;YangJianYing
School: Shanghai Jiaotong University
Course: Logistics Engineering
Keywords: Project Logistics Risk assessment AHP Fuzzy and Synthetic
CLC: F281;F224
Type: Master's thesis
Year: 2011
Downloads: 196
Quote: 0
Read: Download Dissertation
Abstract
|
As global economic integration of the sustainable development, many international companies are increasing the investments in China, while lots of international projects focused on China manufacture market. Project Logistics has highly attention in China. It is important to conduct risk assessment to project logistics, which has high risk in Project execution.This paper conducted the study of logistics risk management for K Project in Qingdao, the main purpose is to find out risk assessment index for project logistics and quantitative calculation model. Based on case study of K project, both qualitative analysis and quantitative analysis are conducted to ensure the assessment quality. In the end, the paper used method of Fuzzy and Synthetic evaluation to choose the plan of Project logistics scheme, which is significant improvement of daily work for Project Logistics.K project is an international project with multilateral cooperation, has high quality and safety requirements. This paper focused on following for project logistics:(1) First, project logistics has been defined and characteristics of project logistics risk have been introduced. The risk index of project logistics has defined as transportation risk, technical risk, delay risk, management risk, decision-making risk, environment risk. Thus it designs hierarchical structure model for project logistics risk assessment.(2) Analytic Hierarchy Process (AHP) was used to indicate the weight of risk index and it will be used in calculation. It resolved the reasonable distribution of assessment index for risk management in project logistics.(3) After the comparison of plenty traditional evaluation ways of existing traditional assessment methods, this article adopts Analytic Hierarchy Process and Fuzzy Comprehensive Evaluation method to establish the risk assessment model for project logistics. The application example from K project was also introduced to show that the model can reflect the practical situation and the logistics scheme can be selected based on the risk assessment. A set of method with the combination of qualitative appraisal and theoretical calculation has been established, which guarantees the evaluation with the objectivity and the accuracy. This has the practical significance to the project logistics risk assessment and appraisal, and advances guiding sense to the project logistics work in the future.
|
Related Dissertations
- Dalian Waters Fire-fighting Forces Deployment Scheme Research,U698.4
- Highland lakes Lakes sustainable development assessment system and model,X22
- The Reaserch and Application of Fuzzy AHP,O225
- The Selection of Leading Industry and Industry Distribution in Environmentally Vulnerable Area,X321
- Research on the Soil Environmental Function Zoning,X321
- Study on Fuel Supply of Henan Straw Power Generation,TM619
- A Comprehensive Evaluation of Heritage Trees,S788
- The Workout of Atmospheric Environmental Risk Prediction Software,TP311.52
- The Heavy Metals Distribution Characteristics and Risky Evaluations of Farmland Soils-Crops Around Different Types of Chemical Industrial Park,X833
- Study of Evaluation System on Security Management of HS Company,F426.21
- Construction of the Social Assessment Model for the University,G647
- Offshore oil platform construction phase Operational Risk Management Research,F426.22
- Mine water inrush investigation Risk Assessment,TD745
- Dairy Enterprise Competitiveness Evaluation System,F224
- Road Traffic Safety Comprehensive Evaluation Method,U492.8
- Chemical Industrial Park Environmental Risk Management Technology Source,X327
- The Project Management Research of Library Cataloging Outsourcing of University Library,G254.3
- Risk Assesement and Risk Reduction in Elevator Inspection Application Research,TU857
- Analytical Study on Coal Mine Safety Supervision System in China,X936
- Research of Process Reengineering in Project Construction Management,F416.6;F224
- Present Situation and Evaluation of Farmland Soil Heavy Metals Contamination in Shandong Representative Region,X825
CLC: > Economic > Economic planning and management > Economic calculation, economic and mathematical methods > Economic and mathematical methods
© 2012 www.DissertationTopic.Net Mobile
|