Dissertation > Excellent graduate degree dissertation topics show

The Dongzhou reservoir risk analysis and reinforcement program

Author: LiFuZhong
Tutor: XuYanSheng;ZhengCanTang
School: Shandong University
Course: Hydraulic Structure Engineering
Keywords: Risk Analysis Failure mode Screening model Event Tree Accident risk rate
CLC: TV698.1
Type: Master's thesis
Year: 2008
Downloads: 189
Quote: 1
Read: Download Dissertation

Abstract


Dangerous reservoirs in China face a lot of wide , the presence of these dangerous reservoirs has seriously hampered the economic and social development , threatening the safety of people 's lives and property . In the face of such a grim situation , the countries gave high priority to the issue of dam safety . In recent years , learn from foreign experience to carry out the dam risk analysis , in order to strengthen the management of the safety of the dam . Risk analysis of its contents , can be divided into risk identification , risk estimation and risk evaluation . In this paper, the actual situation of the Eastern Zhou Reservoir , a comprehensive analysis of its security identification and evaluation and reinforcement design based on on the Dongzhou reservoir risk analysis . First, risk identification , problems existed before and after the reinforcement of the dam , look for the dam all possible failure mode , failure mode screening model created from all possible modes , filter out the biggest threat to dam safety mode . Inferred based on these failure mode the dam may crash path . Second , the risk estimates , the introduction of the event tree risk of dam failure rate , estimate the crash risk rate before and after reinforcement , reinforcement before and after the crash risk compared to identify the weak links in the reinforcement work to leak filled for the the dam further reinforcement, provide the basis . Compare before and after reinforcement of risk before the learned reinforcement after the crash risk than reinforcement significantly reduced , but due to the reinforcement work is not processing spillway gate there is a big risk of potential problems to reinforced dam risk basis , making the reinforcement , therefore , need immediate reinforcement processing spillway gate . Problems exist for the the Dongzhou reservoir spillway gate status quo , to ensure dam safety , it is recommended that the demolition and reconstruction of the spillway gates . In this paper, the reconstruction program of the spillway gate .

Related Dissertations

  1. Research on Dam-Break Probability Analysis Method for Dangerous Reservoir,TV697
  2. Key Technologies of Dam-break Life Loss Risk Assessment Research,TV122.4
  3. Application of Risk Analysis Technique by Combination of Qualitative and Quantitative Methodology in LNG Terminal Projects,F426.22
  4. Risk-based radar software system testing Strategy,TP311.53
  5. Incentive Mechanism of IT outsourcing based on principal - agent theory,F426.6
  6. Application Research in Stock Selection and Optimization Strategies of Portfolio Investment,F830.91
  7. Automotive Electronic Control R \u0026 D Project Risk Management,F426.63
  8. Risk analysis and monitoring information system integration projects in Application,F284
  9. Eastern Liaoning Japanese pine bast scale quantitative risk analysis,S763.3
  10. Swelling rock slope deformation and failure modes and prevention measures,TU457
  11. Lean Six Sigma process improvement in the application of patient safety research,R197.3
  12. Expressway Asset Management System,U495
  13. Quick card connector push back mechanism Improvement of durability,TM503.5
  14. Ma'anshan City mayor hotline 12345 Construction Project Risk Management System,F626
  15. Study and Application on Identification and Evaluation Risk of Automotive Rear Axle Drive Module,U463.218
  16. Construction Risk Analysis and Countermeasures Research of Bridges,U447
  17. Research on Function Division Theory and Method of Asphalt Pavement,U416.217
  18. R \u0026 D projects sedan seal design quality management methods in applied research,F426.471;F224
  19. Risk identification and response equipment and component upgrade project,F272;F224
  20. A company with an annual output of 5,000 tons of ultra-high molecular weight polyethylene fiber financial analysis and risk control,F406.72
  21. Laiwu LC2 × 3000MW Power Plant Project Feasibility Study,F426.61

CLC: > Industrial Technology > Hydraulic Engineering > Water control,hydraulic structures > Hydraulic structures management > Monitoring of hydraulic structures and prototype observation
© 2012 www.DissertationTopic.Net  Mobile