Researchs the Construction New Technique and Engineering Finacial Cast No Gravel Orbit of Sui-Yu Line
Author: LiChengDong
Tutor: DingHongYan;WangZhongHe
School: Tianjin University
Course: Architecture and Civil Engineering
Keywords: Ballastless track Construction Organization New Construction Technology
CLC: U213.244
Type: Master's thesis
Year: 2007
Downloads: 132
Quote: 1
Read: Download Dissertation
Abstract
|
The ballastless track by a concrete or asphalt mixes replaced shot ballast track bed consisting of track structure in the form. Track Irregularity high, stiffness uniformity and good track geometry potential endure significantly reduce maintenance workload ballastless track railway countries has been developing rapidly. Especially the high-speed railway, some countries have ballastless track as the main structure of the track to comprehensively promote. This paper analyzes the ballastless track the status quo, and abroad, focusing on analysis of the ballastless track the development history and current situation in Germany, Japan, France, the United Kingdom, as well as analysis of the history of the development of the domestic ballastless track. Then the Suiyu line Ballastless track the significance of the test described, Suiyu line is my first time into segments laying track, during the pilot study of the construction process, but also for different types of non-ballasted track and line under the structure of the relevant data test, summarize laying experience. The construction of the test section, create our own intellectual property, non-ballasted track with Chinese characteristics has great significance. This paper studies the engineering of Suining-Chongqing line, while areas along the line Suiyu characteristics and engineering geological conditions. Focus on ballastless slab track double block ballasted track construction technology. Ballastless slab track construction is divided into the track plate prefabricated panels under concrete base construction, laying of track plate and CA Mortar key technology. Double block ballasted track construction is divided into the production of bi-block sleepers, double-block sleeper assembly laying. This paper analyzes SuiYu Line construction organization prepared in accordance with the principles of the preparation of the content and preparation of construction organizations started to prepare large-scale temporary works reasonable, scientific. The survey then Chongqing line manpower, materials, equipment. The last the project cost Suiyu line. The ballastless track ballasted track, can help achieve the maximization of investment returns. Then Ballastless track turnouts, carried out the analysis the Passenger Line fasteners, epoxy coated rebar ballastless track the large-scale use of the new material. On-site construction observation, key processes Suiyu line ergonomics. The ballastless track different types of per kilometer cost index calculation and analysis.
|
Related Dissertations
- Ballastless track high-speed railway CFG pile - raft composite foundation settlement calculation,U213.1
- Shanghai World Financial Center construction organization and program design,TU72
- Turnout Group analysis system design based on Visual C ANSYS,U213.6
- Research on the Construction Design of Project Long-Jian-Long 500KV Transmission Line,TM75
- Shuhe ( Shandong section ) Control Project Organization Design,TV85
- Research on Project Construction Organization Plan in Some Residential District in Beijing,F284
- Application of Flexibility Theory on Coast Construction Organization,F284
- Study of the Key Technologies of High-speed Ballastless Track Construction and Dynamic Characteristics of the Standard Span Bridge,U213.244
- Research on Dynamic Characteristics and Dynamic Vibration Absobers of Ballastless Track,U213.244
- Research on Construction Organization Design and Optimization of Qingdao Converter Station,F224;TU72
- Substation Construction Organization Design Optimization and Application Based on GM-AHP,F426.61
- Research on the Application of Value Engineering in Construction Project Cost Control,F426.92
- Study on 3D Checking System for the Ballastless Track in the High-speed Rail Way and Its Error Analysis,U216.3
- Dynamic Analysis of Subgrade and Bridge-Subgrade Transition Section of High Speed Railway under the Vehicle-Subgrade Coupling Condition,U213.1
- The Design and Research of Weak Power System in Intellectualized Residential District,TU852
- Wuhan-Guangzhou passenger dedicated line key construction techniques,U215
- Researching and Developing Information Management System about Unballasted Track of Suiyu Railway Line,U213.244
- East tune south Hanzhuang Canal ( Hukou ~ Taierzhuang ) , continued construction construction organization design,TV512
- Research on Mechanical Characteristics of Ballastless Track in High-Speed Railway,U213.244
- Optimization and Control of Construction Scheduling in Interbasin Water Diversion Projects,TV511
CLC: > Transportation > Rail transport > Railway Line Project > Line constructed > Track > New rail foundation > Ballasted track
© 2012 www.DissertationTopic.Net Mobile
|