Dissertation > Excellent graduate degree dissertation topics show

Research on the Scheme for Shorten the Self-Anchored Suspension Bridge Construction Period

Author: LiuYuanGang
Tutor: ShenRuiLi
School: Southwest Jiaotong University
Course: Architecture and Civil Engineering
Keywords: Self-anchored Suspension Bridge Bridge Construction Construction Period Anchorage System Construction Organization Benefits
CLC: U448.25
Type: Master's thesis
Year: 2013
Downloads: 19
Quote: 0
Read: Download Dissertation

Abstract


Self anchored suspension bridge is a competitive scheme for its beautiful structure and attractive appearance. At present, there are two construction methods,"first beam then cable" and "first cable then beam". Both of the construction methods are bound to precedence relationship on main cable and main beam construction. But it is required to minimize winter construction time in the northern cold regions or for the projects with tight construction period. We must seek other construction methods to minimize the construction period.Based on the idea of reducing the construction period, a scheme which named "beam-cable synchronization" construction method is proposed in the thesis, which means erecting the main cable and catwalk before the main beam construction is completed. The main idea of this scheme was introduced, and the thorough study on the rationality of the construction scheme was carried out. The main beam can not withstand the horizontal loads passed from the main cables. So the primary problem is the temporary anchorage of the main cables when the main cables were erected along with the beam construction. Firstly, analysis was carried out on the eleventh road bridge across the Mudanjiang River in the western of Mudanjiang city. The horizontal force which supported by the temporary anchorage system was calculated when the "beam-cable synchronization" scheme was adopted, and three kinds of temporary anchor systems was discussed and compared from the aspects of horizontal force and engineering quantity, based on which a reasonable temporary anchorage is determined. Then, research was done on different span and different sag-span ratio of the twin towers as well as the single tower self-anchored suspension bridges. A temporary anchorage plan is found to be preferred for self anchored suspension bridges with different span and different sag-span ratio when the "beam-cable synchronization" construction scheme is adopted. In addition, the construction organization of the "beam-cable synchronization" scheme is studied and the social and economic benefits were analyzed, which proves the scheme to be more reasonable.The method discussed could provide a reasonable and economic scheme for the construction of the self-anchored suspension bridge.

Related Dissertations

  1. Community impact study of the distribution of benefits mechanism of development of ethnic village,D422.6
  2. Enterprise Security Benefit Evaluation and Development Strategies,F272;F224.5
  3. The Study of Stakeholders Perspective-based Co-governance Model Selection,F276.6
  4. On the restriction of freedom of expression,D911
  5. Study on Construction Monitoring of Prestressed Concrete Low-pylon Cable-stayed Bridge,U445.466
  6. Research on Construction Design of Precast Splice of Simple Supported Box Girder in High-speed Railway,U445.1
  7. Construction Technology of Steel Structure for Hangzhou East Railway Station,TU758.11
  8. High - pier long-span continuous rigid frame bridge construction linear control technology research,U445.4
  9. The Construction Control Research on Hangers Installation of a Single Tower Self-anchored Suspension Bridge with Large Segment Hoisting Construction,U448.25
  10. The Construction Control for PC Continuous Beam Bridge,U445.4
  11. Construction Process Analysis of Fly-bird-type CFST Arch Bridge and Construction Control,U445.4
  12. Experimental Study on Behavior of Anchorage System for CFRP Tendons,TU377.9
  13. Self-anchored suspension bridge with single tower structure parameters of,U448.25
  14. The Construction Control Research on the Long-span Continuous Rigid Frame Bridge,U445.4
  15. The Dynamic Performance and Seismic Study of Single-Tower Self-Anchored Suspension Bridges with Spatial Cable,U448.25
  16. Key Technology of Structural Design and Construction Control of Tianjin Fumin Bridge,U448.25
  17. Construction Monitoring and Control of Tied-arch Bridge with Flying Swallow,U448.225
  18. Structural Optimization Selection of Tianjin Orthotropic Steel Bridge Deck Pavement,U443.33
  19. Study on the Application of Exposed-aggregate Cement Concrete in Inner Mongolia Highway Engineering,U414
  20. Truss Arch Bridge Construction Control Technology,U445.4
  21. Alliance East Investment ( Group) study of the quality management system,TP311.52

CLC: > Transportation > Road transport > Bridges and Culverts > All kinds of bridges > Bridge: Structure > Suspension Bridge
© 2012 www.DissertationTopic.Net  Mobile