|
Shenzhen comprehensively implement the scientific concept of development, in order to build a \Outside the urban construction in Shenzhen Special Economic Zone under the influence of the SAR has made great progress, but with the rapid development of SEZ, uncoordinated urban development and urban management are becoming increasingly urban problems brought significant. Currently in SAR, carry out a comprehensive statutory plan preparation, these problems have become very prominent problem. How to statutory plans prepared by adjusting the strategy for the urban planning and management to provide scientific and rational basis for the SAR, from the planning point of view to solve the problems of urban development, the SAR, to achieve sustainable development of urban construction, speed up the integration of the SAR inside and outside, has given rise to the relevant government departments and urban planning community's attention. Firstly, through statutory plans in Shenzhen systems and programming and content interpretation, and the same with the national planning system-level regulatory plan comparison, recognizing the statutory plan of Shenzhen City in the approval system and the preparation of a more institutional Strong legal nature. Through the SAR inside and outside the statutory plan comparison, recognizing the preparation of the plans within the region more refined, more emphasis on improving the quality of the city, outside the SAR still in the preparation of statutory plans to address urban primary problem. Thus, according to the SAR prepared in a manner outside the statutory plan preparation SAR SAR, can not cope with the actual situation, should be based on actual problems of SAR, adjust and strengthen the adaptability of statutory plans. Secondly, this paper analyzes that the preparation of statutory plans SEZ facing land structure is irrational, inefficient land use, public infrastructure is weak, the problem of poor image of the city. SAR, coupled with land management \Meanwhile, the SAR, caused by lack of planning put into planning level is not high, planning control is weak, the preparation of a late lead to lag behind urban planning urban construction, urban construction makes the SAR, the problems become more prominent. Although the SAR, in the preparation of the statutory plan approach has made some adjustments, basically effective control of the land for public infrastructure. But there are still many problems, mainly: targeted poor, arbitrary, implementation is not strong. In the study, based on the above issues, in accordance with the combination of short-term goal is far and strengthen the unity of their relevance and the general idea of ??the actual construction of the proposed plan will be divided into five types of legal areas, for different types of regions prepared to take a different strategy. Finally, the study suggests that in the preparation of the SAR, the same type of statutory plan preparation areas should be basically the same strategy, the preparation of five regional strategy are as follows: 1, to guide development areas: meet long-term development goals, scientific and rational use of land; 2, Urban Renewal Area: Strengthening operability land layout should be broad rather thin, focusing on the overall index control; 3, ecological protection zones: strict control of the amount of land and construction features that maximize public open space and greenery; 4, the control Development Area: strict control of new construction, and then when the time is ripe for exploitation or urban renewal; 5, a special region: principled control land use function, future thematic studies. Through five different types of regions corresponding statutory plan countermeasures, hoping to strengthen the Shenzhen SEZ statutory plans prepared relevance and consistency, improve the quality of planning. Also expect fundamentally guided land outside the SEZ reasonable structure adjustment, improve land use efficiency, improve public infrastructure, and create a better urban environment, internal and external integration of the SAR as soon as possible.
|