Research on Construction Project Schedule Management Based on Fuzzy Comprehensive Evaluation
Author: CaiFeng
Tutor: WangXueQing
School: Tianjin University
Course: Management Science and Engineering
Keywords: Risk Analysis Schedule Evaluation Index System Fuzzy Comprehensive Evaluation
CLC: F284
Type: Master's thesis
Year: 2007
Downloads: 659
Quote: 7
Read: Download Dissertation
Abstract
|
The progress of the project is to measure the project management level is an important economic indicators , the project can be delivered within the scheduled time , directly related to the economic benefits of play . The project builders often want to improve the construction schedule and shorten the total duration of construction in order to achieve higher economic efficiency . Currently, the preparation of the project schedule to use more network planning methods . The method for the duration of the project is estimated based on the experience of experts made ??its estimate depends entirely on the individual judgment of the experts . Therefore, the schedule made ??this way are often large deviation with the actual situation . In order to solve the above problems , the risk analysis and fuzzy comprehensive evaluation method to introduce the project schedule management research among the various uncertainties affect the project duration , in-depth analysis , the establishment of a method based on risk analysis and fuzzy comprehensive evaluation project duration estimation model , proposed a more scientific and more accurate duration estimation method . In this paper, a combination of theoretical analysis and practical investigation , extensive investigation for the progress of the project management , project schedule management fuzzy comprehensive evaluation index system is established on the basis of the investigation ; simultaneously with the risk analysis theory of project various options for the duration of the activity options for duration collection , risk assessment, eliminate excessive risk duration , the duration of the meet risk requirements collection ; After collection of the duration of the risk assessment analysis and thus the use of fuzzy mathematical theory , based on the fuzzy Comprehensive Evaluation Method the estimated duration of the evaluation , the final optimized set of options for the duration of each alternative duration of project activities .
|
Related Dissertations
- Key Technologies of Dam-break Life Loss Risk Assessment Research,TV122.4
- BioLab a Bioinformatics Oriented Grid Portal,TP399-C8
- Research on Index System and Evaluation of University Office Greening,G647
- The Study on Risk Evaluation of BOT Projects in China University,G647
- The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
- Evaluation Index System Structure of University Students’ Choreographing Capability of Physical Education Aerobics Majors,G831.3
- Study on Evaluation Index System for Land Ecological Security,X826
- Motor assist system for motorized units,TP311.52
- In Jiangsu Province a Dominance Evaluation of Cropping Pattern Bassed on the Comparative Advantage Theory,S344
- Study on Schedule Plan and Control of Smart Card Appllying System for HNU,TP399-C1
- Studies on Urban Characteristic Culture and Construction of Urban Landscape,S731.2
- An Exploration of the Performance Assessment of the College Counselor,G641
- The Research of Crisis Evaluation of Academic Library Based on User Demand,G258.6
- Comprehensive Evaluation of Safety Production and Optimization of Safety for Yangcheng Coal Mine,X936
- Construction of young scientific personnel evaluation system,C964.2
- On the Program for Evaluating and Cultivating the Core Competitiveness of GY University Press,G239.22
- Application of Risk Analysis Technique by Combination of Qualitative and Quantitative Methodology in LNG Terminal Projects,F426.22
- Study on the Evaluation Method of Flue-cured Tobacco Sensory Characters,S572
- Social insurance agencies risk prevention research,F842.6
- XA city administrative center of e-government network construction project schedule management,D630
- Risk-based radar software system testing Strategy,TP311.53
CLC: > Economic > Economic planning and management > Infrastructure the economy > Organization and management of infrastructure
© 2012 www.DissertationTopic.Net Mobile
|