Abstract


Of shield tunnel construction of a one of the main construction method has been widely used in China has , however Shield as a relatively new method , on the design and construction have a lot of problems to be solved . The first problem is that the shield docking of its natural advantages in the long tunnel , but the technical difficulty is relatively large . The Guangzhou Shiziyang submarine shield tunnel shield docking in the country for the first time . Shield docking stability of surrounding rock ? Choose what kind of docking the most scientific method ? To the Guangzhou Shiziyang submarine shield tunnel engineering background , centrifugal experiments as the main means of research , combined with numerical simulation analysis on this issue discussed, and draw some meaningful conclusions . The second question is : Shield project , lining segments and investment usually accounts for 30 to 40% of the project investment is an important factor to affect the construction of economic and structural security . Under the same conditions , however , the shield segment in China than foreign thick , reinforced with much . Of the design of the shield segment is not too conservative ? Whether on the basis of scientific analysis to further reduce the cost ? Through field tests and numerical analysis , seeks to explore the true force of the shield segment shield the design of the tube sheet to provide scientific guidance . The main results are as follows : (1) The theory of the centrifuge test to determine the centrifugal acceleration of the centrifuge test , and completed the surrounding rock similar material , tunnel structure similar material preparation, model making and production of machinery and equipment . ( 2) China Institute of Water Resources and Hydropower centrifuge, shield the docking tunnel face the centrifuge test , focus on the shield docking tunnel face stability and force . Shield docking stability of surrounding rock some meaningful conclusions . (3 ) shield segment to carry out a large number of measured work , get the shield segment , the bolt actual stress . (4 ) combined with the measured data , the use of beam joints are not continuous model , numerical simulation analysis on the the shield segment by force , and compared with the measured values ??, a few meaningful conclusions .

Related Dissertations

  1. Undersea tunnel water inflow forecast and grouting waterproof,U453.61
  2. Research on Segment Mechanics Characteristic and Face Stability of Tunnelling in the Process of Shiziyang Tunnel Construction,U455.43
  3. Study on Digital Borehole Camera Technique and Its Application on Grouting Effect Test in Subsea Tunnel,U456.3
  4. Study on Anti-Slide Analysis and Centrifugal Model Test of Small Diameter Steel Tubular Anti-Slide Row Piles,TU473.1
  5. Complex geological conditions undersea tunnel roof thickness of,U451
  6. Study of the Grouting Technique of Jiaozhou Gulf Sub-Sea Tunnel in Qingdao,U455.49
  7. Study of the Structural and Mechanical Performance of Underwater Shield-bored High Speed Railway Tunnels and the Boring and Docking Technologies,U455.43
  8. Research on the Bearing Performance of the Super-Long and Large-Diameter Bored Pile,TU473.1
  9. Study on the Face Stability of the Sand Layer at Xiang’an End of Eastern Passage of Xiamen Subsea Tunnel,U452.11
  10. Fly Ash Embankment Key High Technology Research,U416.1
  11. Research on Load-adjusting Technique of High-filled Culvert on Base of Settlement Controlling,U417.3
  12. The Blast Working of Xiamen Subsea Tunnel and the Research about the Influence Effect on Surrounding Rock,U455.6
  13. Study on Project Propertys of Salinized Soil Along National Road 314 from He Shuo to Ku Er Le,TU448
  14. Test and Theory Study on Shaft Resistance Softening of Large Diameter and Super-Long Piles,TU473.16
  15. Centrifuge and Numerical Studies of the Influence of Basement Excavation on the Underlying Tunnel,TU753
  16. Study on Highway Embankment Construction Technology in High Liquid Limit Soil Area,U416.1
  17. Key Construction Technology of the Submarine Tunnel of the Eastern Passageway in Xiamen,U455.4
  18. Study on the Detection Technology of Structural Function of Sub-Sea Tunnel on Xia-Men East Passage,U459.5
  19. Tunnel spray anchor retaining structure bearing mechanism and applied research,U455.72
  20. The Physical Model Experiment Research of the HK-Zhuhai-Macau Undersea Tunnel Ventilation,U453.5

CLC: > Transportation > Road transport > Tunnel project > Tunnel construction > Construction methods > Shield Law ( full- face excavation )
© 2012 www.DissertationTopic.Net  Mobile