Dissertation > Excellent graduate degree dissertation topics show

The Safety Analysis When the Newly Subway Shield Tunnel Is Crossing the Existing Railway Turnout

Author: LiYingChun
Tutor: GuAiJun
School: Beijing Jiaotong University
Course: Road and Railway Engineering
Keywords: Shield Tunnel excavation Turnout structure Turnout for geometrical
CLC: U455.43
Type: Master's thesis
Year: 2010
Downloads: 124
Quote: 2
Read: Download Dissertation

Abstract


With the rapid construction of China 's subway , subway construction spread to the suburbs , new subway through the large railroad stocks Road , the the turnout area 's largest railway crossing project more and more . The turnout is one of the three weak links in the track structure , particularly busy railway transport tasks , many crossing construction , the railway sector requires the normal operation of the train , and zero crossing construction settlement demands . Beijing Metro Line 9 line abundance the East to FENGNAN shield tunnel beneath the Fengtai Railway Station project as the basis , the use of ABAQUS finite element analysis software , turnout - two-lane tunnel three-dimensional finite element static model , analyze Shield the different ways of tunnel excavation , the structural safety of turnout ( evaluation turnout structure deformation and turnout static geometry bit , including turnout settlement , lateral displacement of the rail , high and low , horizontal, triangular pit , rail - to - gauge) . Mainly from the following aspects were analyzed : (1) the left tunnel excavation , analysis of changes in turnout geometric bit , get the left tunnel excavation caused turnout geometry geometric curve ; (2 ) turnout asymmetric structure , the right lane tunnel excavation , comparative analysis of left and right lane tunnel excavation caused turnout for geometrical changes ; (3) On the left tunnel excavation on the basis of , the right lane tunnel open dig , analysis of the soil caused by for right lane tunnel excavation secondary disturbance turnout geometry bit ; (4) two-lane tunnel excavation simulation , analysis of turnout geometry bit ; ( 5 the ) Summary shield tunnel through the security control measures adopted by the turnout structure , and pre- foundation reinforcement, buckle rail reinforcement to change the strength of the synchronous grouting , verify the effectiveness of various security controls turnout geometry bit control .

Related Dissertations

  1. The Research of Intangible Cultural Heritage under the Shield Dance of Yunghsin Vision Status and Development Strategies,G852
  2. Mohist Thought of Military Science,E092
  3. The Surrounding Rock Monitoring and Finite Element Simulation of Subway Tunnel,U455.43
  4. Equivalent shield tunnel modeling and seismic response analysis,U452.28
  5. Water-rich sand and gravel formations Shield Excavation Numerical Simulation of surface subsidence caused by,U455.43
  6. TBM airlock multi-point earth pressure prediction and optimization control method,U455.43
  7. TBM cutterhead drive system energy technology research,U455.39
  8. Based on B -spline shield machine airlock pressure field distribution in the soil,U455.43
  9. The composite earth pressure balance shield the cutterhead cloth knife law and the cutter CAD system development,U455.3
  10. Performance Evaluation and Construction Technology on Shading Pavement,U416.2
  11. Analysis on Stress Mechanism of Wu Shaoling Tunnel in Broken Rock,U451.2
  12. Chracteristic Analysis of Dual-drive Planetary Gear Reducer with Large Power of Shield Machine,TH132.46
  13. Reliability Evaluation and Optimization Design of the High Power Reducer Based on Earth Pressure Balance Shield,U455.39
  14. Research on Optimization Problems in Guidance System for Shield Tunneling,U455.43
  15. The Design of the ILS Stimulation,V241.4
  16. Study on the Damage Evaluation and Denfence of the Surface Buildings Caused by Tunnel Excavation Based on GIS,TU746;P208
  17. Research on the Characteristics of Low Wind Speed Startup Vertical Axis Wind Turbine,TK83
  18. Research on the Estabilishment and Ealuation of Monitoring System during Metro Hields Construction of Disaster,U456.33
  19. Based on FMECA of Subway Construction Risk Monitoring Information System,U455.43
  20. The Mechanical Research of Lining-Structure Joint in the Construction of the Metro Station by Shield Tunneling Method Combined with Mining Method,U455.43
  21. Cross-Harbour Tunnel shield on ground stability and construction process segment mechanical properties,U455.43

CLC: > Transportation > Road transport > Tunnel project > Tunnel construction > Construction methods > Shield Law ( full- face excavation )
© 2012 www.DissertationTopic.Net  Mobile