Dissertation > Excellent graduate degree dissertation topics show

Study on the Stability and Remedical Measures of Deposit Landslide on the Exit of Nanyuegou Chasm Tunnel

Author: GaoXiongYing
Tutor: ZhengLiMing
School: Southwest Jiaotong University
Course: Geological Engineering
Keywords: landslide stability analysis engineering remedy anchor cable pile numerical analysis.
CLC: U456.33
Type: Master's thesis
Year: 2005
Downloads: 322
Quote: 6
Read: Download Dissertation

Abstract


The deposit landslide on the exit of Nanyuegou chasm slide locates in the crucial section of this tunnel, which influences the completion of the Sankai Super Highway. It is typical for its origin reasons, deformation failure mechanism, and geometry boundary conditions. With investigation into the geologic environment and deformation characters, divide the landslide into upper and lower parts, and the study shows that the shallow layer landslide comes into being as the coming into action of parts of the ancient landslide, because of the excavation of highway side slope in the shallow layer deposit landslide on the upper part of the deep layer ancient landslide.After analyzing stability, draw the conclusion that the shallow layer landslide is in the unstable condition, and the deep layer landslide’s stability declines because of the dragging of the evacuation of highway’s side slope. In order to control the landslide, synthesis engineering means must be used. Analyze the adaptation of the engineering remedy measure combinations, and these measures have been proved having good anti-slide effects by numerical calculations.In order to solve the problem that the vertical force is larger than the admissible anti-shear force in the slice division plane, use the transmit coefficient method to make corrections. The safety coefficient is taken into consideration for analyzing the sliding face by the piles and transmit-coefficient slice method is introduced when studying the sliding force. The formula deduction and program design are based on the condition when pre-stressed anchor and the anchor cable reach concordance. By using these programs, the structural and internal force of the pre-stressed anchor cable anti-slide pile is calculated and a reasonable pre-stressed value has been gained. The result has been proved by numerical analysis.

Related Dissertations

  1. Pattern Classification of Combustion Modes in Scramjet,V235
  2. Qinghai-Tibet railway landslide hazard assessment,P642.22
  3. Optimization of Zhenqing two standard K29 450 to K29 900 paragraph excavation slope stability analysis and reinforcement,U418.52
  4. Measurement of Geotechnical Properties for Sewage Sludge at a Disposal Site and Evaluation of Its Influence on Slope Stability of MSW Landfill,X705
  5. Landslide monitoring technology in the transmission line Monitoring System,TM76
  6. Two Finite Difference Methods for Schr(?)dinger Equation Based on Richardson’s Extrapolation Technique,O241.82
  7. Karst tunnel project , and karst Treatment Research,U455.49
  8. The Cut Slope Stability Analysis and Governance Research in Tong Ping Highway,U416.14
  9. Study on the Stability of Horizontal Stratum Rock of Shi ZiWa Tunnel in PingYao-YuShe Highway,U451.2
  10. The Design and Stability Analysis of Subgrade Cantilever-anchor Retaining,U417.11
  11. Study on Stability Analysis and Risk Assessment of Flexible Retaining Wall,U417.11
  12. Dali residential ZK86 Pear Creek Road Slope Stability Analysis and Governance,TU43
  13. Soft rock steep slope landslide prediction Method,P642.22
  14. Stability Analysis and Evaluation of High Rock Slopes of Luishia Mine,P642
  15. Prone multi - model evaluation of GIS-based landslides in Guizhou Province,P642.22
  16. Based on multi -level stations Jinchuan two mine ventilation Ventilation systems analysis,TD724
  17. Li Wu copper mine goaf processing technology research,TD862.1
  18. A Study on Failure Mechanism and Stability of High and Steep Rock Slope in the Open Pit of Daye Iron Mine,TD854.6
  19. Study on Algorithms Related to Voltage Security On-Line Assessment, Index, and System Building,TM712
  20. Analysis and Control of Voltage Stability Based on Power Flow Algorithms,TM712
  21. Formation Mechanism and Adaptability of Panzhihua Iron and Steel Company’s New Basis of the V-Si in Xichang,TU42

CLC: > Transportation > Road transport > Tunnel project > Tunnel observations and experimental > Tunnel construction and use of monitoring > Disaster forecast and protective measures
© 2012 www.DissertationTopic.Net  Mobile