Abstract
|
Nowdays, many reservoirs are facing the increasingly outstanding contradictions between flood control and generating electricity, storing water and generating electricity, how to Solve these contradictions, raising the level of developing operation management, and gaining a better social and economic benefits ,which are becoming to an important problem to be solved urgently. Taking The research of Wan’an reservoir of JiangXi province for example ,This thesis has focused on the risk of storing water and generating electricity is caused by the uncertainty of the reservoir inflow in the operation of the reservoir .The main works and contributions of the study was stated as follows:(1)Based on the actuality of the research, the paper has summarized the definition of the risk of reservoir operation, the object of risk analysis and the method of research, and also pointed out the shortages of risk analysis on the theory and method.(2)According to different targets and compartmentalizings, the paper has classed the reservoir operation, introduced the common models and measures of reservoir operation .Combining with the connect conditions, the paper established a optimal long-term operation model of Wan’an reservoir, while giving attention to firm capacity. According to the model, the plan’s long- term benefit of the different flood seasons operating level was gained. Analysing the result of calculation, we find that long-period average generating electricity was closely connected with the main flood season and the later flood season’s operating level, from the view of benefits of electric power generation ,and enhancing the main flood season’s operating level is more efficiency.(3)The thesis set the main flood season operating level and later flood season operating level as corresponding variable, different scheme of water level’s varying process and time interval’s generating electricity operation function has been gained by optimal operation model. The function has two characteristics: firstly, he main flood season, the later flood season and non-flood season have different generatingelectricity operation functions; Secondly, every time interval(month or a period of ten days ),the generating electricity operation function was composed of several linear equations. The output increased as the available water added, to a certain extent, because of the reduction of reservoir level, the overflow discharge will increase, the water head will be lacking but the output will reduce instead .(4)Two kinds of method describing the stochastic character of reservoir inflow have been discussed. One is that reservoir inflow is subject to Perison-m distribution without considering inflow forecast available. Another is that reservoir inflowinformation Q*is given with considering forecast error which is subject to normaldistribution. According to stochastic simulation by MC, the risk of storing water and generating electricity are gained .The research indicate: In the main flood seasons, the risk of storing water with reservoir inflow information is less than without inflow forecast available, and the risk of generating electricity with reservoir inflow information is less than without inflow forecast available. In the later flood season, the risk of storing water is less than the risk of generating electricity with and without inflow forecast available. With inflow forecast available influences on the risk of storing water more than the risk of that without inflow forecast available.
|
Related Dissertations
- Key Technologies of Dam-break Life Loss Risk Assessment Research,TV122.4
- Application of Risk Analysis Technique by Combination of Qualitative and Quantitative Methodology in LNG Terminal Projects,F426.22
- Risk-based radar software system testing Strategy,TP311.53
- Random Number Theory and Its Application in the Trichotomy,O211.6
- The Financing Research of Thermoeletric Generator Project (2x30 Million Kilowatts) in Datang LuBei Power Generation Co-operation,F426.61
- Evaluation Research fuzzy Andi dam safety,TV64
- The Analysis and Prevention of the Securities Business Department Operational Risk,F832.2
- The Research on Risk Management of Guangang Home Developing Project,F293.3
- Investigation on Analyzing of Security of Power Generation Equipments,TM307
- Research on Renovation of Monitoring System in 500kV LuoDong Substation,TM63
- The Decision nd Risk Analysis of Inventory Impawn Loans Based on the Unity Credit Mode,F832.4;F224
- Risk Analysis and Countermeasures Study on V Company’s Single Supplier Management,F274
- Embankment Dam Danger Emergency Detection Technology and Risk Management,TV698.1
- Multi-level Fuzzy Synthetic Evaluation for Dam Failure Based on Stochastic Simulation,TV122.4
- Researches on Risk Assessment and Preventive Control of Static Voltage Stability of Power System,TM712
- Application Research in Stock Selection and Optimization Strategies of Portfolio Investment,F830.91
- Credit Risk Analysis on Commercial Banks’ Group Customers,F832.4
- Risk Analysis and Control Strategy of Milk-run Based on Integration of VMI and TPL,F274;F224
- Research on the Post-evaluation of the Indoor Coverage System’s Investment Project of Shenzhen Mobile Branch,F626
- Study on Fleet Building Decision for Iron and Steel Enterprises,F552
- Method of Unit Commitment Based on an Improved Artificial Bees Colony Algorithm,TM73
CLC: > Industrial Technology > Hydraulic Engineering > Hydropower utilization of hydropower project > Hydropower station construction and equipment > Operation, management
© 2012 www.DissertationTopic.Net Mobile
|