Dissertation 

About 72 item dissertation in line with construction stage query results,the following is 1 to 50(Search took 0.043 seconds)

  1. Study on Quality Control of WX Home Project Construction,SunWenZuo/Ocean University of China,0/4
  2. Research on Coordination Management among Different Participants in Construction Stage,XuKanKan/Qingdao Technological University,0/13
  3. Study on Engineering Cost Control during Construction Stage of A Company Resettlement Residence Project,LiMeng/Hebei University of Technology,0/109
  4. A Research on the Cost Control at Construction Stage of Engineering Project,WeiXue/Xi'an University of Architecture and Technology,0/124
  5. Simulation Analysis and Experimental Research on Static Performance of Three-span Continuous Variable Cross-section Prestressed Concrete Bridge,YingLingYun/Chang'an University,0/7
  6. Multivariate Analysis of Risk Assessment Method during Construction Period for Mountain Bridges,XieGongYuan/Chang'an University,0/40
  7. Invstigations on Risk Control of Safety Constuction of Project,PanXiLing/South China University of Technology,0/28
  8. Research on the Risk Identification and Evaluation Management in Pre-Construction Stage of Real Estate Development Project,ZhuZuo/East China University of Science and Technology,0/354
  9. The Mechanism of the Preferred Project Management Research about Real Estate Enterprises in Construction Stage,LinZuoZuo/,0/15
  10. Instrument and Electricity Engineering Quality Management Research of Mixing Project Construction Phase of Y Company,GuZhenXiao/East China University of Science and Technology,0/28
  11. Analysis on Vertical Force Behavior and Thermal Stress of Pile Groups,ZuoZhaoXing/Northeast Forestry University,0/4
  12. Research on Risk Control of Change of Dayawan No.301Project,ZhangFen/Jilin University,0/45
  13. Study on the Construction Stage of Human Error Analysis and Human Reliability Evaluation,YangMingMing/Xi'an University of Architecture and Technology,0/153
  14. Risk Management of Construction Stage of Engineering Project,GuoYing/North China Electric Power University,0/277
  15. Performance Analysis of Reinforced Concrete during Construction Period in Building Structure,LiLi/Chongqing University,1/62
  16. Research on PMBOK Applied to Stage Action of Low-carbon Construction,LiuXiaoDong/Tianjin University,0/60
  17. Study on Follow-up Audit of Construction Project Based on Cooperative Game Theory,WeiYuMei/West China University,0/1
  18. Commercial and Residential District of Equipment Engineering Management and Control of Project Implementation,YuZhanSheng/South China University of Technology,0/52
  19. Research on the Cost Management and Control of Architectural Project in Construction Stage,ChenYaWei/Huazhong University of Science and Technology,0/104
  20. Study on Mechanical Behaviour and Selection Technology of Segment Lining Structure of Shield Subway in Construction Stage,DuanFeng/Anhui University of Technology,2/100
  21. Study on Thermal Effects of Super Long-Span Concrete Arch Bridge with Cfst Stiffened Skeleton,ZhangDongQing/Southwest Jiaotong University,1/25
  22. Study on the Afection of Pier Inclination and Sectional Dimensions Error to Continuous Rigid-Frame Bridge,ZhangChuanQing/Chongqing Jiaotong University,0/15
  23. Study on Risk Assessment for Continuous Rigid Frame Bridge with Super High-pier during Construction,LiLingJun/Chongqing Jiaotong University,0/56
  24. Applied Research of the Combination Elastic Modulus in CFST Arch Design,MaDengYang/Chongqing Jiaotong University,0/0
  25. Continuous Rigid Frame Bridge Construction Phase Seismic Response Analysis and Response Measures,ZhangXiaoYu/Chongqing Jiaotong University,0/0
  26. Based on Wireless Sensor, Consider Construction Stage of the Large Span Bridge Modal Analysis,ChenGuoRui/South China University of Technology,0/60
  27. Stability Analysis of Long-Span Concrete Arch Bridge with Stiff Skeleton,GuYing/Southwest Jiaotong University,2/68
  28. Cable Force Optimization Research in Reinforced Concrete Arch Bridge Cantilever Cast-in-place Construction Process and Determination of Reasonable Finished State,ZuoYinHui/Changsha University of Science and Technology,2/62
  29. Research on Risk Management of Gui-Guang High-Speed Railway during Construction Stage,XuZhiShun/Lanzhou Jiaotong University,0/1
  30. Study on the Influence of Early-age Material Property on Durability for Concrete in Different Construction Condition,ChenZuo/Zhejiang University,0/158
  31. Study on Risk Analysis Method of Long-span Bridges during Construction,ZhangJie/Tongji University,16/916
  32. Study on Rock Mass Sub-Classification in Construction Stage for Road Tunnel,LiuDaGang/Southwest Jiaotong University,13/560
  33. Study on Nonlinear Mechanical Behavior of Special-Shape Arch Bridge and Analysis of Its Dynamic Chara Cteristics,HuoXueJin/Southwest Jiaotong University,1/208
  34. The Research on Vertical Differential Shortening of Steel Frame Reinforced Concrete Corewall Structure When Considering Concrete Shrinkage and Creep,HuangXiangXiang/Hunan University,3/255
  35. The construction phase of the project cost risk analysis and countermeasures,LinXiaoZhi/Central South University,5/433
  36. Imitate Analysis of Construction Control of Cable-stayed Bridge,ZhangJingZuo/Hefei University of Technology,3/155
  37. Construction of a new socialist countryside development Philosophical Perspective,WangXiuLi/The Central Party School,0/148
  38. Research on Prestressing Effect of Externally Prestressed Steelbox-concrete Composite Continuous Beam Bridge,BinFan/Beijing Jiaotong University,1/108
  39. Study on Three-Dimensional Flutter Analysis in Frequency-Domain of Suspension Bridges and Their Flutter Stability When Erection,AiHuiLin/Southwest Jiaotong University,10/272
  40. Flutter Analysis of Long-Span Suspension Bridge during Erection,XuYou/Southwest Jiaotong University,4/137
  41. Self-anchored Suspension Bridges Key Construction Phases Analysis and Investigation,DongChunYan/Beijing Jiaotong University,5/248
  42. Deformation Analysis of Curved Girder Bridges in Construction Stage,ZhangPeng/Chang'an University,2/174
  43. Analysis and Stabilization of Continous Rigid Frame Bridge with High Piers and Long Spans,XiongWen/Southwest Jiaotong University,5/230
  44. The Analysis on Mechanical Property of Maocaojie Long-span Bridge Model Test,YangRiHua/Changsha University of Science and Technology,14/236
  45. Study on Concrete Face Rockfill Dam Construction Diversion Standard and Flood Passing Measures During Construction Period,HuangJun/Dalian University of Technology,0/138
  46. Research on the Cost Management and Control of Architectural Project in Construction Stage,OuXiangJie/Tianjin University,3/1001
  47. Performance Evaluation System of Construction Quality Management,ZhengLiNa/Xi'an University of Architecture and Technology,2/299
  48. Study on High-Speed Railway Cost Control of Total Cost Management,XuZuoQiang/Southwest Jiaotong University,2/414
  49. Study on Effects of Erection Methods for Flutter Stability of Long-span Suspension Bridges during Erection Stage,LiWenTao/Southwest Jiaotong University,1/50
  50. Simulation Analysis of Whole Bridge and Research on Construction Method of Self-anchored Suspension Bridge,ZhangKun/Beijing Jiaotong University,6/214

Total 2 Pages First Previous 1 2 Next Last

© 2012 www.DissertationTopic.Net  Mobile