Dissertation 

About 38 item dissertation in line with life cycle cost analysis query results,the following is 1 to 50(Search took 0.077 seconds)

  1. Analysis on Performance Degradation of Steel Structures and Maintenance Strategy Optimization Considering Corrosion,WangZhi/Tianjin University,0/4
  2. Analysis of Public Buildings Energy-saving Potential Based on Energy Simulation,ZhangWenJie/Harbin Institute of Technology,0/107
  3. Application Study on Typical Exteiror Wall External Insulation of Hefei Area in Building Energy Conservation Engineeirng,MiaoShiXiang/Anhui University of Architecture,0/25
  4. The Energy Efficiency Design and Application Research of Self-thermal Insulation System of External Walls in Changsha,ShaZhen/Hunan University,0/103
  5. Study on Defective Quality and Pay Adjustment of Asphalt Pavement,ZhaoZuo/Chang'an University,0/22
  6. Research on Structural Performance of Highway Graded Gravel Base Asphalt Pavement,LiuJingLi/Hebei University of Technology,0/38
  7. Systematic Analysis and Evaluation of Chemical Energy Products in Natural Gas Industry,HuangZhiXian/South China University of Technology,3/789
  8. Theory, Method and Application of Highway Construction Policy Based on Life-Cycle Benefit,ShenHongYan/Tongji University,4/1115
  9. Life-Cycle Cost Analysis of Construction Project Basing on Concrete Durability,WangZengZhong/Tongji University,15/1386
  10. Study on Durable Asphalt Pavement Structure with Rigid Base,MaQingLei/Chang'an University,19/989
  11. UCAV system life cycle cost,LuKai/Northwestern Polytechnical University,3/944
  12. Study on Bridge Management System,ZhangXinZhan/Chang'an University,23/827
  13. Life-Cycle Cost-based Bridge Whole-life Design Method,PengJianXin/Hunan University,6/721
  14. Road User Cost Analysis and Applied Research,XuGuoChu/Hunan University,4/153
  15. Analysis on the Rationality of Asphalt Pavement with Asphalt Treated Base,XuAiLi/Hebei University of Technology,4/179
  16. Designing and Life Cycle Cost Analysis on Composite Shear Wall System with Heat Preservation Formwork,SuDongZuo/Taiyuan University of Technology,2/147
  17. The Universities Engineering Application the Life Cycle Cost Analysis Method Research,LiMingYang/Dalian University of Technology,3/209
  18. Research on All-life-cycle Cost Model of Residence,ZhangLi/Southeast University,12/390
  19. Analysis and Prediction on the Life Span & Costs of Dormitory Buildings of Jilin University Qian-Wei Southen School,LiYuMei/Jilin University,3/242
  20. GIS-based project-level pavement management system development and application,GeXueJun/Southwest Jiaotong University,6/304
  21. Energy Life Cycle Cost Analysis of Building Project,LiQin/Tianjin University of Technology,3/452
  22. The Operation and Management of External Wall Insulation Technology in Jia Tai Xing Yuan Program,MaXiangQuan/Xi'an University of Architecture and Technology,1/92
  23. A Research on the Key Construction Technique of Large and Thick Cement Stabilized Aggregate,ZhaoWei/Chang'an University,4/50
  24. Study on the Maintenance Time of Asphalt Pavement Preventive Maintenance,DingXueSong/Shandong University,1/223
  25. The application of value management in construction project design stage,WangZuoRong/Central South University,1/204
  26. Study on the Life-cycle Cost of Jinan Hongrui International Starcity Construction Project,LiFen/Ocean University of China,1/94
  27. Study on Decision-making in Bridge Maintenance and Bridge Management System,ZhaoJin/Chang'an University,4/304
  28. Study on Project Payment Methods of Asphalt Pavement Based on Accepted Indexes,ZhangPeng/Chang'an University,2/65
  29. Study on the Reasonable Thickness of Asphalt Pavement for Heavy-traffic High Grade Highway,TangPeiPei/Chang'an University,1/137
  30. Asphalt Pavement Quality Control Strategy Analysis,XiongJia/Changsha University of Science and Technology,1/91
  31. A Method Research for Cost Optimization of Maintenance and Repair Measures for Bridge Pier Based on Stochastic Simulation,ZhaoZuo/Tsinghua University,1/56
  32. Study of Choice the Best Scheme in the Chemical Process Based on Multi-attribute Decision Making Method,JiaoZheng/Wuhan Institute of Technology,0/21
  33. HTEY the Life Cycle Cost of Missile Weapon System Contralling Issue Research,GaoZuo/Harbin Institute of Technology,0/84
  34. The Research of the Usage of Thick Cement Stabilized Stone Base,XiangLiuFu/Chang'an University,0/33
  35. Simulation of Ground Temperature in Gshp System Based on Dynamic Load,WangHuiPeng/Tianjin University,2/98
  36. Study on the Performance-Life-Cost Based Design Method and System Development for RC Girder Bridges,LiuBoQi/Tianjin University,1/125
  37. Study on Evaluation Method for Comprehensive Retrofitting of Existing Buildings in North China Based on LCCA,ZhangShuang/Tianjin University,0/136
  38. Application Study of Life Cycle Cost Analysis on Industrial Waste Water Treament Engineering Project,SunJun/Shanghai Jiaotong University,0/23

Total 1 Pages First Previous 1 Next Last

© 2012 www.DissertationTopic.Net  Mobile