Dissertation > Excellent graduate degree dissertation topics show

The WACKER Company redispersible powder project risk management research

Author: ChenRongBin
Tutor: ChaiJunWu;LiYong
School: University of Electronic Science and Technology
Course: Project Management
Keywords: Project Construction Risk Management Plan Risk Identification Risk Analysis Risk Response Planning Risk Monitoring and Control
CLC: F416.92
Type: Master's thesis
Year: 2010
Downloads: 36
Quote: 0
Read: Download Dissertation

Abstract


The projct risk management research of Wacker dispersible polymer powder will mainly solve the risk management of chemical buidling material project during the construction, such as risk identification, risk analysis, risk evaluation, risk reponse and risk monitoring and control, thus it could make sure of sucessful construction by decreasing the cost maximumly within the risk scope.This thesis will mainly focus on the objects above and has the background of 5000 T/y dispersible polymer powder project for Wacker Chemie AG, make a full application research for the risk management of chemical buidling material projects. The main content is as follows:1.The basic connotation of risk and engineering project risk, for all the process of engineering project risk management, especially for risk identification, risk analysis, risk evaluation, risk response and risk monitoring and control, it discusses in details and trys to find the combining point of risk management, project management and chemical buidling material projects.2.This thesis uses the risk theories at the project risk management for 5000T/y redispersible polymer powder of Wacker Polymer (Zhangjiagang) Co.,Ltd., does the full analysis for this project including project risk management plan, project risk identification, then makes project risk response plan, project risk monitoring and the outcomes by executing risk management, trys to identify risks, evaluate risks and manage risks in the early stage of projects, searches the response and solving plans for risk management, decreases the project risks and make sure of the sucessful execution of projects.3.Based on the risk analysis, according to the effects of risk actors, this thesis endows main affected actors with value, defines risk level. This could easily analysize and direct actual works. Following by this idea, it makes deep analysis for project construction risks, working condition risks, powder exploding risks for producing equipments, others units and equipment risks. The total risk analysis combines the quality and quantity actors, calculates the risk levels of this project. 4.For the main risk levels, this thesis analysizes main factors of risks, lists the controlling steps of this project, combines the theories and facts together and has strong actual reference value.

Related Dissertations

  1. Key Technologies of Dam-break Life Loss Risk Assessment Research,TV122.4
  2. Drought Risk Analysis of Dazhen Irrigated Area,S423
  3. Application of Risk Analysis Technique by Combination of Qualitative and Quantitative Methodology in LNG Terminal Projects,F426.22
  4. Research of Quality Control of Decorative Construction,TU767
  5. Financial Leasing Enterprise Risk Control and Analysis,F224
  6. The Application of the Risk Management in 3G Construction Projects,F626
  7. Research on the Telecommunication Design and Survey Project Management,F626
  8. Influence of New Jiuyanshan Tunnel Crossing the Existing Operatine Railway Tunnel,U455.4
  9. Comprehensive Research of Construction Management of Cheng-Guan Railway Station Engineering,F532.8
  10. Risk factors based on the context of IT outsourcing research,F49
  11. Spillage Risk Assessment & Countermeasures Study for Meizhou Bay 300,000 Tonnage crude Oil Berth,U698.7
  12. Analysis on Project Investment Benefits and Risks of Wu Xiangliang Wind Farm,TM614
  13. Wind-resistant Risk Analysis of Long-span Rigid Frame Bridge during Construction Period,U448.23
  14. Shanghai Hong (EV) as the intelligent video analysis project investment and financing decisions,F285
  15. Study on Analysis and Control for Project Schedule of Jinping First-level Hydropower Engineering Constrution,TV511
  16. Risk Management Study of Underground Coal Gasification Project during Site Testing Period,F426.21
  17. Research of Fawer Automobile Parts Co., Ltd. ERP Project Risk Management,F426.471
  18. Study on the Pest Risk Analysis in the Quality and Safety Management of Agricultural Products,F322
  19. Tourism Real Estate Investment Analysis of China,F592
  20. The Analysis of Investment Risk in Changing the House Sites to Rooms in Dongli District of Tianjin,F301
  21. Research on Prediction and Alarm of Hyphantria Cunea Drury in Hebei,S763.3

CLC: > Economic > Industrial economy > The world's industrial economy > Industrial sector economy > Construction, water conservancy
© 2012 www.DissertationTopic.Net  Mobile