Abstract
|
This thesis relies on the project of the Yellow River bridge external highway of Jishi Gorge hydroelectric power station funded by upper reaches of the Yellow River hydroelectric development limited liability company. The paper mainly studied the key constructing technologies to the long span continuous rigid frame bridge under the complicated condition, and this thesis carried out the detailed treatise and study for the constructing technique of 0~# section, the design and constructing technique of the light hang-basket, the constructing technique of the continuous rigid frame beam, the spot constructing technique of the section in beside span, the technique of the closure section, the constructing technique of the three- direction prestressed concrete box beam with changing cross section, the line form control technique of the long-span continuous rigid frame bridge and etc. It can be as reference to constructing of the same kind of bridges.The paper consists of four chaoters totally. The emphasis parts are chapter two and chapter three. The chapter three is the most important part.Chapter 1 mainly introduced the development、the structure characteristic、the constructing technology of the superstructure、the development trend of continuous rigid frame bridge and the main contents of the paper. Continuous rigid frame bridge is a kind of bridge structure form that is widely used in railroad and highway in recent decades. It is welcome by the reasonable strains and stresses, the beautiful configuration, the low protecting expenses etc. With the development and progress of the design, the constructing craft and material, the long span continuous rigid frame bridge usually has been designed to the three-direction prestressed concrete box beam with changing cross section. The span has been developed up to several hundred meters now.The main method for constructing continuous rigid frame bridge is cantilevered construction method. That is cantilevered concreting method in sections or cantilevered assembling method from the top of pier. The Yellow River bridge external highway of Jishi Gorge hydroelectric power station is located at the lower reaches of the dam of Jishi Gorge hydroelectric power station over the Yellow River. The left bank connects with the external highway of Jish Gorge hydroelectric power station ,and the right bank connects with the highway along the Yellow River. The bridge is 75 m high. Through the comprehensive comparison of the technique and the economy, the bridge span is adopted to 1×32 m simple bearing bridge +(96+168 +96) m prestressed concrete continuousrigid frame bridge.Chapter 2 carried out summarize for the constructing technique of 0~# section, the design and constructing technique of the light hang-basket, the constructing technique of the continuous rigid frame beam, the spot constructing technique of the section in beside span, the technique of the closure section and etc. The constructing technology of 0~# section is one of the key constructing technologies of the superstructure of continuous rigid frame bridge, the general design is a thin wall structure of space, the volume is big, the structure is complicated, the common reinforcing steel bar and prestressed reinforce is densely, and the construction is most difficult. The hang-basket is divided into four kinds of the joist type( including flat string type without balance weighty, rhombus, and the bow string type...etc)、slant pulling type (including triangle and prestressed slant pulling type)、steel type and admixture type ;it is divided into three kinds of the press-heavy type ,the solid type and half press heavy and solid type according to anti-capsizal type; it is divided into two kinds of once walk and twice walk according to walk type; it is divided into three kinds of the roll over type , the glide type and sectional type according to move way. The main craft work for cantilevered constructing continuous rigid frame bridge by the hang-basket is infusing 0~# section - installing thehang-basket - infusing 1~# section - the hang-basket move forward、adjust- infusing the next beam section; completing cantilevered construction in turn; toring down the hang basket; closing the beam section. Chapter 3《STUDY ON CONSTRUCTION TECHNOLOGY OF THE SUPERSTRUCTURE OF THE YELLOW RIVER BRIDGE OF JISHI GORGE HYDROELECTRIC POWER STATION)) is the hardcore of the paper. this thesis carried out the detailed treatise for the general project situation of the Yellow River, the constructing technique of 0~# section, the design and constructing technique of the light hang-basket, the constructing technique of the long-span continuous rigid frame beam, the spot constructing technique of the section in beside span, the technique of the closure section, the constructing technique of the three-direction prestressed concrete box beam with changing cross section, the line form control technique of the long-span continuous rigid frame bridge and etc. The main method for constructing continuous rigid frame bridge is cantilevered construction method of the light rhombus hang-basket, infused concrete is sent by infusing-pump, the span of thebeam is long, there are many sections in cantilevered construction, the weight is big, the time is long, the work condition changes much, the influence factor is many, how guarantee high accuracy of construction, the bridge line form of the end realization design, attain the expectation to be subjected to the dint appearance, is one of the key techniques of the bridge’s construction. the 0~# section adopts to the infusing project two times, cantilevered construction of continuous rigid frame bridge is to hang bottom template, outside template to the hang-basket, form cantilevered construction operation flat, colligate reinforcing steel bar successively, install prestressed pipeline, install inner template, infuse concrete construction in turn. When the concrete attains 80% design strength and satisfies 3 days period, pull prestressed work, then move the hang-basket forward and complete infusing grout work, thus become a construction circulation. Pulling prestressed reinforcing steel bar and infusing grout of vertical is behind lengthways after half month and a month.Chapter 4 is the summary of the paper, the key constructing technologies to the long span continuous rigid frame bridge under the complicated condition relies on the project of the Yellow River bridge external highway of Jishi Gorge hydroelectric power station, It can be as reference to constructing of the same kind of bridges.
|
Related Dissertations
- The Research on Artisitify Technology of Santiago·Calatrava’s Architectural Works,TU-86
- An Empirical Study of Contemporary Compehensive Urban Design in China,TU984
- Influence of Inclined Secondary Air on Gas-Solid Flows in a W-Shaped Flame Boiler,TK229
- Inheritance and Innovation of Literature Research on Book of Songs,I207.22
- A Contrastive Study of Buyi Language and English Speech Sounds,H319
- Non- intellectual factors on the Revelation of middle school students in chemistry learning,H319
- The Clinical Study of Bianmi Ⅰ Hao on Constipation Complicated by Hemodialysis for Spleen-Kidney Deficiency and Dampness Originating from Interior,R259
- Retuospective and Follow up Study on the Treatement of Pneumonia in Zhe Elderly by Integrated Tradi-Tional Chinese and Western Medicine,R563.1
- Comparative Research on the Contents of Information Technology in Elementary Schools between China and India,G623.58
- The Study on the Competence of Rural Junior High School Head Teacher in Nansha District,G635.1
- Guangzhou Dialect Area Junior Ancient Poetry and Prose Teaching Are Explored,G633.3
- Clinical Study of the Extremely Low-frequency Pulsed Electromagnetic Fields on Accelerating Fracture Healing,R683
- The Junior Middle School Language Teaching Text Analysis on the Cultivation of Autonomous Learning Ability,G633.3
- Guangzhou City high school physical education in the status quo and countermeasures,G633.96
- Analysis on the Marketing Problems in Small and Medium-sized Sports Events and Countermeasures Research,G80-05
- Professor Kong Guangyi academic thought Qing Xuan main Treating children cold cough,clinical research and clinical experience,R249.2
- A Correlational Study of Anxiety in English Classroom Writing and Writing Performance of Middle School Students in Guangzhou,G633.41
- An Action Research on the Influence of Classroom Interaction on High School Students’ English Speaking Proficiency,G633.41
- Case Studies of Three English Teachers of Vocabulary Teaching Strategies in a Junior High School,G633.41
- A Study on the Relationship between the Spirituality and Self-Consistency of College Students,B844.2
- The School-running of Buddhist Nun Department in Fujian Buddhist Institute,B947
CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction Technology
© 2012 www.DissertationTopic.Net Mobile
|