Abstract


With the construction of passenger railway line, there will be a great deal of ballastless track built on bridges. The new Beibei Jialingjiang River is the first bridge which adopt longitudinal connected ballastless track. It is the first time to build longitudinal connected ballastless track on such long span bridge in our country even in the world, and some design concepts, design methods , materials are innovatively used. Therefore, it has vital significance for consummating the design method to analyze the theoretic calculation and study the experimentation.To reseach the longitudinal interaction between track and bridge, a calculational model with rail-slab-bridge was established by the structure analysis softwear ANSYS, and with witch, temperature force, braking power, rupture force of the rail-slab-bridge system was caculated. The calculational results show that temperature force is the key load of longitudinal connectede ballastless track.Secondly, the static experiment of the ballastless track was discussed. The static experiment consists of temperature force of the base slab, the relative displacement between base and bridge, the force of the restrict dado and the bridge-slab connected framework. The results indicated that variation law of the test item above was basically the same, they all augmented as the temperature increases.Lastly, the static experiment of the ballastless track was also discussed. The dynamic experiment has mainly following aspects: (1) the dynamic parameters of the track, (2) the safety stock of the track structure under different running conditions, and (3) the force and distortions of the WJ-7 fastener, validate its design parameters, and provide reference to optimize the structure design, meanwhile to afford important basis for the fastener form selecting. The test results indicated that the longitudinal connected ballastless track on the new Beibei Jialingjiang River bridge met the demand of traveling security. The slip layer has actualized its slippage and reducing the interaction between bridge and slab, and has met the design require.

Related Dissertations

  1. The Study on the Detection Technologies and Equipment of Flue-cured Tobacco Leaves Physical Performance Parameters,S572
  2. The Practice and Theory on Blended Learning by COmputer in Physical Education,G807.0
  3. Based on Response Spectrum Finite Element Analysis of Dynamic Characteristics and Seismic Response for Cable-stayed Bridge,U441.3
  4. Ballastless track high-speed railway CFG pile - raft composite foundation settlement calculation,U213.1
  5. Study on 3D Checking System for the Ballastless Track in the High-speed Rail Way and Its Error Analysis,U216.3
  6. Thermal Performance and Operation Characteristics of a Novel Solar Energy Water Heating System in Conjunction with Air Source Heat Pump,TU822
  7. 140m high-speed railway steel box tied arch bridge construction technology,U445.4
  8. Ballastless turnout turnout area board mechanical properties,U213.6
  9. Non- ballasted track construction measurement and control of key technologies,U215
  10. Two Different Training Methods on the Skills of Cheerleading Athletes Core Strength in Rats,G831.3
  11. Researching on Stable Performance of Ballastless Track Embankment Structure in Beijing-Tianjin Passenger Transport Line,U213.1
  12. Turnout Group analysis system design based on Visual C ANSYS,U213.6
  13. Jiangyin City High School Physics Experiment Teaching Survey Research,G633.7
  14. Static Damage Identification of Long-Span Cable-Stayed Bridge Based on Support Vector Machines,U441.4
  15. Research on Function State and Safety Evaluation of Fuling Wujiang Second Bridge,U446
  16. The Research of Cement Emulsified Asphalt Mortar in Ballastless Slab Track of High-speed Railway,U214
  17. New Construction Technology Research of Ballastless Track,U213.244
  18. Test Research on Mechanical Characteristics of CRTSâ…ˇ Slab Track in High-speed Railway Ballastless Track,U238
  19. Analysis of Long-Term Test of High-Speed Railway Ballastless Embankment and Transition,U213.1
  20. Wu-Guang Passenger V Tendes Crucial Problem Management Research,U215.1
  21. The Feasibility Study of the Outward Bound Project Introduced into Tangshan High (Vocational) Institutions PE,G807.4

CLC: > Transportation > Rail transport > Railway Line Project > Line constructed > Track > New rail foundation > Ballasted track
© 2012 www.DissertationTopic.Net  Mobile