Dissertation > Excellent graduate degree dissertation topics show

The Application Study of CFG Compound Foundation in BeiJing-ShangHai Highrall QuFu Eaststation Engineering

Author: WuXiangYang
Tutor: LuPeiYi;ZhangJunBing
School: Tianjin University
Course: Architecture and Civil Engineering
Keywords: Soft ground treatment CFG Pile Key technologies Research
CLC: U238
Type: Master's thesis
Year: 2009
Downloads: 57
Quote: 1
Read: Download Dissertation

Abstract


Soft ground treatment is the technical difficulty of the of roadbed design and construction , but also easy to cause uneven track key factors , attaches great importance to this issue at home and abroad , especially in China , the vast , complex geological conditions , together with the railway line across large area , high - speed railway is strict control of settlement , including the effect of CFG pile in soft foundation treatment , including construction technology, quality control measures , ground treatment effect evaluation conducted some research and made ??some important engineering practice conclusions and understanding . Not long high-speed railway construction time speed of more than 350 km of high-speed railway construction history just a few years , in the refinement of the soft ground treatment and control of scientific aspects also need in-depth study and practice , in order to meet the high-speed railway line ride comfort requirements of the foundation . Beijing-Shanghai high-speed railway is the first high-speed rail project in the true sense of our construction , along adverse geological conditions exist , at the same time the level of construction technology , construction workers are unskilled , largely engineering construction risk. In order to avoid the risk , one of the main problems is how to improve the reliability of the construction technology of soft ground , apparently based construction technology experience in major construction projects in need of further research , the construction technology more systematic and scientific . The characteristics of this thesis CFG pile in the construction of the Beijing-Shanghai high-speed railway Qufu East Station field practice for premises poor geological conditions , large projects , a tight schedule to study several aspects : 1 , the Beijing-Shanghai high-speed railway using design philosophy and structure in the form of CFG pile foundation treatment ; 2 , the Beijing-Shanghai high-speed railway CFG pile foundation treatment of the construction process and construction of key technologies ; CFG pile construction quality control ; 4 CFG pile construction organization for scientific reasonable arrangements to ensure that the premise of quality, schedule , and achieve economic rationality ; CFG pile construction testing and evaluation . Explore the above research content through the analysis of the data collected in the field , the establishment of the system of CFG pile construction technology , to provide guidance for future high-speed railway CFG pile construction .

Related Dissertations

  1. The Realization of Coal Liquefaction in the Continum Model System and the Experimental Research of Coal Liquefaction,TQ529.1
  2. Study on Restoration of the City Gate of Shangjing in Parhae,TU-05
  3. Poor Scholars in the Tang Dynasty Mentality of,K242
  4. Research of Aerospace Science Research and Innovation Building Design,TU244
  5. Bibliometrics Analysis on Published Research Papers of Physical Education Teachers in Shanxi Province Universities from 2005 to 2009,G807.4
  6. The Application Study of Lao Tze Thought in the Chinese Teaching of Middle School,G633.3
  7. A Teaching Research on Junior Students Who Have Difficulty in Maths Learning Learn in a Happy Classroom,G633.6
  8. Study on International Development Strategy of Chinese Research Universities,G647
  9. Study on the Results of Heilongjiang University’s Social Science Research Evaluation System,G644
  10. Current Situation and Countermeasures of Coastal Protective Backbone Forest Strip in Ningbo,S727.2
  11. Chen Shu- long academic thinking clinical research and clinical experience and the treatment of spleen dampness Huoxuetongmai method of PTS,R249
  12. Local Party Committee’s Supervision of Decision Research,D262.2
  13. A Practical Research on the Education of How to Be a Healthy Person in Morality for Students at Rural Junior Middle Schools,G631
  14. Research on Standardization and Accuracy of Use on Junior High School Physical Education Teaching Methods,G633.96
  15. A Research of the Teaching Methodology of High School Lu Xun’s Novels: From the Standpoint of Words Life Representation,G633.3
  16. Outward Bound to the introduction of the experimental study of junior high school students sunshine sports,G633.96
  17. Shandong Province,university research projects Integrated Management Model,G644
  18. Design and Research of Urban Toilet and Its Landscape,TU993
  19. Application of Ascending-Descending Theory in Treatment of Chronic Renal Failure,R277.5
  20. Go through the academic ideas and a summary of clinical experience and three sons and four cents decoction children cold to relying stagnation cough clinical research,R249.2
  21. Study on Cheng Zhongyuan’s Research Concerning Zhang Wentian (1979-2008),D239

CLC: > Transportation > Rail transport > Special railway > High-speed rail
© 2012 www.DissertationTopic.Net  Mobile