Research on Cost Analysis and Schedule Control of National Science Project

Author: LiuLinNing
Tutor: LiWeiGang
School: Harbin Institute of Technology
Course: Mechanical and Electronic Engineering
Keywords: Large scientific projects Project Management Cost estimating Schedule management
CLC: F284
Type: Master's thesis
Year: 2010
Downloads: 160
Quote: 0
Read: Download Dissertation

Abstract


At present, China is in the economic development of the construction period, to achieve breakthrough scientific research, for walking in certain areas in the international forefront of scientific fields in the world to enhance our core competitiveness and sustainability , the Government invest huge amounts of money to build large Science and Engineering project. After full verification by China every year, a number of big science projects, that huge investment, large scale, long period, large-scale multidisciplinary research projects will be set. These projects are of great scientific significance, the results will be of great originality, so that our country can have a place of international science.By analyzing the characteristics of national science projects, and the present situation of the cost and progress management , I have established a set of big science projects for complex cost estimation model according to U.S. PMBOK, and based on VBA MS Project for secondary development, developed a cost estimate module to make it suitable for large scientific projects with cost estimates feature, combined with MS Project cost management features, people can manage the cost of big science project efficiently and accurately.There are several kinds of appraised tools on project process ,they are all important, and have good application.With the greatly scientific project character, I focused on the Monte Carlo simulation method, compared the CPM technique, PERT techniques and Monte Carlo method in the evaluation of the merits of the project progress,finaly used Crystal Ball software to establish the Monte-Carlo simulation model, and transplanted this model to MS Project. Then carry on the forecast and the optimization to the background project“Shen Guang -Ⅲ”progress, guaranteed that the project can finish as scheduled. By using the Monte-Carlo model, this complex difficult quantitative analysis work becomes simple convenient, and the result is more accurate reliably. Application of the results showed that: Using Crystal Ball software to build the Monte Carlo model, the output is abundant , it is an effective tool to analyze and optimize the project schedule.

Related Dissertations

  1. An Empirical Study of Contemporary Compehensive Urban Design in China,TU984
  2. The Study of Project Management Theory’s Applying in Work of Communist Youth Leagur of Universities,D297
  3. Study on Top-post Internship Program Management in Vocational Colleges,G712.4
  4. Research on Building Teachers’ Team with Double Skilled Quality in Secondary Vocational Education Based on Project Management,G715.1
  5. Research on Agent Construction System Management Model of Highway Project,F283
  6. XA city administrative center of e-government network construction project schedule management,D630
  7. CNOOC Engineering Project Management Integrated System,F426.22
  8. Project management in new product development in the use of cigarettes,F426.8
  9. DAB company beverage freezer case study project operations management issues,F426.82
  10. EMU maintenance base in Guangzhou Project Management Research,F532
  11. Electric Power Construction Construction Management,TM73
  12. Chemical Construction Company Human Resource Management,F426.7
  13. Crude oil loading system transformation project management research,F284
  14. Existing Problems in College Entrepreneurial Education Project and Countermeasures,G647.38
  15. Voluntary service project management of major sports events in China,G812
  16. The Project Management Research of Library Cataloging Outsourcing of University Library,G254.3
  17. Caofeidian Heavy Equipment Plant Project Schedule Management Research,TU722
  18. Heilongjiang Unicom WCDMA network project schedule management research,F626
  19. A Fuzzy Earned Value Method Based on Quality Factor,F284
  20. The Dongqi reconstruction of major projects in the process control,F426.471
  21. Study on the Progress Management of Campus All-in-one-card Project in Qingdao Shi’s Nan District Primary Schools,G629.2

CLC: > Economic > Economic planning and management > Infrastructure the economy > Organization and management of infrastructure
© 2012 www.DissertationTopic.Net  Mobile