Dissertation > Excellent graduate degree dissertation topics show
Analysis and Experimental Study about Extended Structure of Bridge
Author: ZhangZuo
Tutor: ChenZuoMin
School: Chang'an University
Course: Bridge and Tunnel Engineering
Keywords: Continuous box girder Shrinkage and creep The basis of differential settlement Splicing structure Experimental study
CLC: U441
Type: Master's thesis
Year: 2011
Downloads: 58
Quote: 0
Read: Download Dissertation
Abstract
|
With the rapid development of China's economy , the flow of persons and goods continue to increase , and the early construction of the first batch of the highway and many low-grade roads can no longer meet the rapidly increasing volume of traffic , so the need for these road alteration or extension . Currently, China has completed part of Highway Widening and expansion work , highway alterations completed and put into operation after many universal problems , many of the overall widening of the upper part of the small - span bridge structure at the joints , such as the bridge longitudinal cracks , horizontal to produce dislocation chew on the edge , seriously affected the key to driving comfort , even the impact of traffic safety , the success or failure of the old bridge widening control factors not only the structure of the overall force performance , connected parts of the local force control is stitching factor. To solve this problem , in this paper, even Huo highway expansion project in the typical 5 × 30m span prestressed concrete continuous box girder bridges the telephoto ditch Bridge as the background , widened the old and the new box girder structure of the overall force performance and stitching parts of local stress analysis and experimental research . This study include finite element analysis method widened the old and new bridges concrete shrinkage , creep of secondary forces caused by the differences and the basis of differential settlement of differences was calculated and analyzed ; bridge is widened further examination and through on-site load test vehicle loads the bridge force condition improved , and then from the the construction angle and design point of view put forward reasonable proposals after the same type of bridge widening . The research results show that the connection time to postpone the new and old beams can effectively improve the stress state of the structure ; Newbridge basis of lateral nonlinear settlement can effectively improve the force status of the old and new bridge connection from the theory , the new bridge piers the basis of double-column pier is more reasonable ; through field experiments show that the old bridge structure forces the situation has improved to some extent .
|
Related Dissertations
- Experimental Study of GUI QIN MISTURE on Adriamycin-induced Nephropathy in Rats,R285.5
- Gas and coal dust explosion characteristics of coexistence and Communication Research,TD712
- The Experimental Research on Process Evaluation Applying for the General Course of Breaststroke Teaching in Harbin University,G861.1
- The Use of Incentive Strategies on the Study of the Impact of Sports Participation in Primary School Physical Education,G623.8
- An Experimental Study on Teaching Model of "Chain Combination" of the Convention and the Option of High School Physical Education,G633.96
- The University Body Teaches Specialized Speed Skating Pu to Repair in the Class to Apply Therepresentation Training Method the Experimental Study,G862.1
- The Pueraria bulk wine injury rat serum sex hormone levels,R285.5
- The Theoretical and Experimental Research on the Collocated MIMO Detection,TB566
- Experimental Study of the Performances of Air Filter Materials for Fine Particles Removal Utilized in Residential Buildings,TU834
- Design and Experimental Study of High Performance Miniature Channel Heat Sinks,TK124
- Investigation on Vortex-Induced-Vibration of Flexible Risers with Buoyancy Modules,TB123
- Comparison of corporate charitable donations Effect,F224
- DDT -based power control mechanism of warhead,V271.41
- Henan typical low-temperature ceramic sand curing mechanism and technology research,U414
- Shandong Institute of Physical Education Teaching and Training Basketball physical experimental study,G841
- Catalytic reduction of nitrogen oxides of iron Experimental Study,X701
- Water pump corrosion properties of metallic materials,TG174.3
- Ceramic press the development of large flow proportional throttle,TH137
- TBM cutterhead drive system energy technology research,U455.39
- Research on the Dynamic Characteristics of High Speed Solenoid Valve for ABS,U463.526
- Study on Deformation Control of Long-span Continuous Rigid Frame Bridge in Construction Stage,U448.23
CLC: > Transportation > Road transport > Bridges and Culverts > Structural principles, structural mechanics
© 2012 www.DissertationTopic.Net Mobile
|