Dissertation > Excellent graduate degree dissertation topics show

The Study of Project Schedule Managementperformance Evaluation System

Author: JiangHuanZhi
Tutor: JiaHongJun
School: Shandong University of Science and Technology
Course: Structural Engineering
Keywords: Schedule Management Performance Evaluation System fuzzy comprehensive evaluation
CLC: TU722
Type: Master's thesis
Year: 2011
Downloads: 242
Quote: 2
Read: Download Dissertation

Abstract


At present, the economy of China is in the period of rapid development, the government’s strengthening infrastructural investment policy has promoted the construction project’s sustainable development. Progress of the project management is a key element of project management. Whether the project is delivered within the scheduled time is directly related to the economic and social benefits of the project. Complexity, difficulty and importance of the modern engineering construction project decide the need for establishing the performance evaluation system of schedule management, and to monitor and evaluate the implementation of the project objective, comprehensive, efficiently and accurately, and to detect and solve problems. Objective evaluation of the status quo of progress on the project is both the basis of progress control and the foundation of project management decision-making.This paper starts from the actual status of performance evaluation of the progress management, combined with the progress management features and foreign advanced concepts on performance evaluation, and objective analyze of the problems in theory and practical application.On this basis, building a new engineering project schedule management performance evaluation system model and using fuzzy comprehensive evaluation method to evaluate the performance of the progress of the project for large NanShan tunnel, and finally propose further research directions.

Related Dissertations

  1. The Study on Risk Evaluation of BOT Projects in China University,G647
  2. The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
  3. Research and Application on Ventilation Disasters’ Early-Warning and Pre-Control Technology in Coal Mine,TD76
  4. The Study of Fuzzy Evaluation Method in the Society Assessment of Highway Construction Project,F282;F224
  5. Gas Disaster Prediction of Xiaoming Coal Mine in Tiefa,TD712
  6. The Fuzzy Comprehensive Evaluation Method and Application Research of the Open-pit Slope Stability,TD824.7
  7. Safety Assessment of Coal Gangue Hazard and Analysis of the Greening Reclamation,TD849.5
  8. AFA3G manufacturing localization project schedule management research,F426.61
  9. China - ASEAN Free Trade Area of Guangxi Agricultural Mechanization and Countermeasures,F752.7;F224
  10. Research of Schedule Management System for Real Estate Program,F293.3
  11. ZF College Teachers’ Performance Evaluation System Research,G647.2
  12. Research on Competence’s Evaluation of the Large Retail Enterprise of China,F224
  13. Research on the Production Process of Enterprises Based on Cellular Automata,X936
  14. Digital image steganography analysis and evaluation systems research,TP309
  15. Zhoucun the Schedule Management of the SC Road Landscape Reconstruction Project,U418.9;U415.2
  16. RL Company Performance Appraisal System Optimization Research,F272.92
  17. Inner Mongolia,hubaoe Economic Area Logistics Development Model,F224
  18. Flight quality evaluation system based on fuzzy comprehensive evaluation,V328.3
  19. Research on Communication Management Research of Company,TU71
  20. Research on Risk Assessment Method for Large-scale Space Development Project Based on ANP-FCE Model,F224
  21. Study on Design Schedule Plan and Control of EPCM Project,TU722

CLC: > Industrial Technology > Building Science > Construction > Construction organizations and programs > Construction plans
© 2012 www.DissertationTopic.Net  Mobile