Dissertation 

About 55 item dissertation in line with Critical Path Method query results,the following is 1 to 50(Search took 0.025 seconds)

  1. The Research of Schedule Management in TV-financial Application Project of Shanghai Orientpay,LinZuo/Jilin University,0/9
  2. Research on Schedule Management of ZQYDTX Base Station Construction Project,ZhongJiaChao/South China University of Technology,0/31
  3. Application on Schedule Management in Panlong Substation Construction Project,ChenZhiYou/Xiamen University,0/7
  4. Research on Schedule Management of Ship Unloader Overhaul Project for Z Company,WuDongXu/South China University of Technology,0/19
  5. Research on Schedule Management of Signal System for H Subway Project,LongGuangQian/South China University of Technology,0/38
  6. The Application of Critical Path Method in Project of Communication Operator Network Management System,ChenZuo/Shanghai Jiaotong University,0/58
  7. Research on Resources Optimization and Scheduling in Network Plan Technology and Its Application,LiQiang/Anhui University,0/82
  8. Risk and Schedule Management of Drug Research and Development Projects in CK Institute,LiQiangZuo/University of Electronic Science and Technology,0/23
  9. Study on Application of CPM Based Gantchart,YePing/Zhejiang University of Technology,0/129
  10. Research on Development Process Control in Ying’s Shower Enclosure Project,MaRong/South China University of Technology,0/43
  11. CPM Application Study on PC760Project Management in DSIC,ChenWei/Dalian University of Technology,0/37
  12. Research for Design Management of Steel Plant Water Treatment Project,YanJuMing/Shanghai Jiaotong University,0/46
  13. Schedule Management in Chengdu Liquid ASU Project,XuZuo/East China University of Science and Technology,0/33
  14. Project Scheduling Study on TM SWC Pilot Coater Project,QiuZhenYu/East China University of Science and Technology,0/36
  15. Establishment of Jordan AMCP Cement Project Schedule Plan and Analysis of Influencing Factors on Schedule,ZhuBing/Hefei University of Technology,4/175
  16. The Research of International Engineering Management in Technip CNOOC Project,HeYiRui/Shanghai Jiaotong University,4/268
  17. Study on the Application of BANT Basic Network and Its Algorithm,ShenYuZhong/Zhejiang University,0/68
  18. The new class of consumer electronic products import business process reengineering,SaKun/Shanghai Jiaotong University,1/183
  19. Project Management Applyied to KLQ6109 Coach Development,AoMin/Shanghai Jiaotong University,3/229
  20. A Kind of Research of Processing Procedure Optimization for Nonstandard Job-Shop Scheduling,LiuQiuShan/Harbin University of Science and Technology,0/62
  21. The Study on Designing Resource Management to Improve the Benefit of Designing Enterprise,ChenWenJing/Tianjin University,3/145
  22. The Appliance of Fuzzy Mathematics in Construction Supervision,GaoPeng/Hefei University of Technology,1/163
  23. Research and Realization of Job-Shop Scheduling Algorithm based on ACPM and BFSM,XieZhiQiang/Harbin University of Science and Technology,2/97
  24. Research on the Organization and Planning for Construction Project Management of Sichuan Radio & TV Tower,ZhouLiXin/Sichuan University,4/258
  25. Project Management for Factory Transplant,LinSong/Shanghai Jiaotong University,2/282
  26. Research for Some Aspects in Network Planning Optimization,XuYan/North China Electric Power University (Beijing),0/248
  27. The Study of Coal Enterprise Equipments Management,ChenRuiQiang/Tianjin University,6/370
  28. The Research of Model and Application of Schedule-Cost Performance Appraisal in Program,JiGeDi/Inner Mongolia University of Technology,3/383
  29. Research on Production Manufacturing Time Models for Large-Piece OKP Enterprises,XueJianHong/Chongqing University,2/347
  30. Large power plant construction project progress metrics monitoring system,PeiShaoHua/Shandong University,3/229
  31. Time parameters based on five network planning optimization theory,JiangXiaoMi/North China Electric Power University (Beijing),4/244
  32. Summary of management practices and optimization studies of the progress of the large bridge project,ShenGang/Nanjing University of Technology and Engineering,6/553
  33. Arrangements with earned value analysis based on resource constraints CPM project schedule,ZhuXiangSong/Zhejiang University,26/776
  34. The Research on Servers Industrial Packaging Business Processes Reengineering in E Corporation,LiuZhiGang/Chongqing University,0/58
  35. Study on Network Planning Considering the Resource-dependency,WuWeiXing/Tianjin University,2/124
  36. Integrated management of a project bid,GaoXiang/Fudan University,0/77
  37. Research and Design of Job-shop Scheduling Methods of Non-close-joining Operations,MoTao/Harbin University of Science and Technology,0/41
  38. Drag Acoustic Target Project Scheduling Optimization and Application Based on Genetic Algorithm,WangGuoJi/Shanghai Jiaotong University,2/91
  39. Time Management and Strategy Research on Telecommunication Construction Project,ZhangXiu/Beijing University of Posts and Telecommunications,1/216
  40. A Schedule Algorithm Based on Cumulating Idle-time Partitions of Machine,HuHuoYan/Harbin University of Science and Technology,0/23
  41. The Study of Locomotive Maintenance Optimization Based on Network Planning Technology,YangRui/Southwest Jiaotong University,0/114
  42. Research on the Project Progress Management about Electrical Equipment Installment and Debugging of Transformer Substation,YangJun/North China Electric Power University (Beijing),3/326
  43. Research on Reserved Time Characteristic of Multi-terminal-nodenetwork-planning Diagram,LinCheng/North China Electric Power University (Beijing),0/36
  44. Research on Schedule Management of G Engineering Investigation Project,ZhangMuZeng/South China University of Technology,0/119
  45. The Comparison and Empirical Study on PERT/CPM and CCM in Project Management,HuangZhengXing/Tianjin University,1/106
  46. Research on a Scheduling Method about Single and Mini-batch Production Based on CPM and TOC,HuDongHua/Nanjing University of Aeronautics and Astronautics,4/77
  47. The Application of Time Management in Project of Olympic Communications Support Preparation,ZhouXin/Beijing University of Posts and Telecommunications,0/16
  48. The Application Research of Project Risk Assessment and Control in Communication Engineering Construction Projects,SongYongJuan/Beijing University of Posts and Telecommunications,0/45
  49. Research on the Schedule Planning of Petroleum Technology Service Project Group,ZhangHongYuan/Northeast University of Petroleum,0/58
  50. Study of the Life Cycle Collaborative Management the Construction Bidding in Large-scale Public Projects,ZouXiaoJie/Tianjin University,0/194

Total 2 Pages First Previous 1 2 Next Last

© 2012 www.DissertationTopic.Net  Mobile