|
The continuous development of the port , the port facing increasingly fierce competition , how the most effective use of Minato resources , reduce investment costs , improving the customs environment , improve service levels , is placed in each port operators , port management departments should be solved before the and coordination problems . Resolve this contradiction , a centralized inspection mode , is to solve one of the Minato duplication of investment , the occupation of land resources , integrating inspection resources , energy conservation is more favorable way . This article describes the the coastal port port inspection status quo , there are issues and trends , particularly Customs and CIQ dispersed in Port inspection carried out in the system for examining research , but did not realize the port units inspection of concentrated . For each inspection unit inspection of import and export containers , process , analyze the necessity and feasibility of the construction of the port inspection units in Minato centralized inspection . Optimization method estimates the construction scale, centralized inspection area to determine the scale of the construction of the central inspection area . Simultaneous analysis of the layout of the the centralized inspection area corresponding to the overall layout of the form for port type , conclusively for the first time put forward the the centralized inspection area for different port planning \layout morphology of this concept . Analyzed the inspection area is currently focused in the practical application of the Container Port .
|