|
Project project feasibility study is the most important content, it refers to the project before the decision, according to market demand and economic development planning, regional planning and industry development planning requirements, the items associated with the society, economy, technology, market, resources and other aspects to conduct a comprehensive, in-depth technical economic analysis, comparison and demonstration of the project; economic, social and environmental benefits of scientific prediction and evaluation; thus judged project technically feasible, economically reasonable and scientific method. In this paper, Weifang, "A company with an annual output of 100000 sets of JK60S variable geometry turbocharger" project for the study, An analysis of the project construction and operation of the status quo, existing problems, At the same time, project engineering, decision-making, survey and design, construction, supporting continued construction and operation of the various links in the management of a detailed investigation and analysis of the assessment, Put forward the idea of scientific research.In this paper, according to the history and logic of the order of the first studies to project feasibility theory undertook combing, the feasibility study of the contents, procedures, evaluation of financial beneficial result are discussed, analyzed the connotation and characteristics of the project loan assessment. Second, the principle of the introduction of the system, economies of scale Theory, optimization of investment principle, the risk of the uncertainty principle of output of 100000 sets of JK60S variable geometry turbocharger is estimated that analysis. Third, the project works, decision-making, survey and design, construction, supporting continued construction and operation of link analysis and management assessment, Project finance various economic indicators detailed calculation, The use of quantitative and qualitative means of combining the financial benefits of the project to make an objective evaluation. At the same time taking into account the current social development, the project’s social and environmental factors also made the assessment, the success of the project sums up the experience and shortcomings, on this basis, and to improve the overall efficiency of the project, to achieve sustainable development, made a number of improvement measures. The results show that:a company with an annual output of 100000 sets of JK60S variable section turbine supercharger project decision-making and correct, the construction process in line with the state capital construction procedure, the social benefit is great, local economic and social development play a larger role; project construction for similar project construction provides valuable experience, filled composite nozzle of variable geometry turbocharger for the domestic, international is blank. Products to adapt to market demand at the same time can quickly formed a series of products, and comprehensively promote the domestic for Euro IV above the discharge requirements of the turbo R & D process, as the engine technology progress, the environment and social benefit, produced positive effect.
|