Dissertation > Excellent graduate degree dissertation topics show
Based on the Risk Attitude of the Fixed-price Contract Risk and Countermeasures
Author: ZuoZhaoJun
Tutor: LiZuo
School: Dongbei University of Finance
Course: Technology Economics and Management
Keywords: fixed—price contract engineering guarantee engineering insurance risk measures
CLC: F284
Type: Master's thesis
Year: 2011
Downloads: 58
Quote: 0
Read: Download Dissertation
Abstract
|
Along with the development of our country’s construction industry, the research in the field of construction activities are increasing. As well as the project contracting model research, but also a lot of fixed price contract risk and its countermeasures to explore the theory and research is very limited, which is not quite match with the reality of an increasingly wide range of applications of fixed-price contracts in the construction market, also has a certain degree of contrast with many problem exist in the implementation of the fixed-price contract. Therefore, the purpose of this study is to provide a more effective and reasonable solution methods of the risk problem to a fixed price contract application process, namely the practical application of "engineering insurance and guarantee". Through the detailed analysis of risk factors and the reasons in the fixed-price contract implementation, with the engineer insurance and guarantee, which is gradually development perfect in our engineering construction field, as the breakthrough point, take the risk attitude theory and contract theory as a guide, combining the existing research results, this paper puts forward the points and Suggestions about the contract risks effectively guard against the fixed price contract risk.In this paper, the author used the method of combining of theory and empirical analysis to describe the applicability of risk measures, and thus further improve the proposed measures to prevention the fixed-price contract.Because the lack of research on the fixed—price contract in domestic, on the basis of the existing research on the fixed—price contract risks, this paper do further elaborates the connotation of the concept of fixed—price contract and risk management, and point out the problem that carry out the fixed—price contract under our current conditions, furthermore, this gives the direction for subsequent research. And then, through the definition of the risk problems and it"s reasons in the implementation of fixed—price contract, with the risk attitude theory and engineering insurance and guarantee theory, combined with the contract risk management methods under the existing conditions, get the main points of this paper.The main research method of the theme could be summarized as "principal—agent" theory of the institutional economic, transaction cost theory and contract theory. combined with empirical case studies to analysis and discuss the points.In the first chapter, the meaning and value of the theme, the research status, context, research scale and the research framework are introduced. In the second chapter, the definition and characteristic, contract theory, principal—agent theory, transaction cost theory are combed. In the third chapter, I introduce the characteristic, classification and reasons of the contract risk, focus on the analysis of the risk of fixed—price contract, combined with the risk attitude and utility theory to analysis the contract parties attitude and utility on the risk. In the forth chapter, the definition, characteristic and application of the engineering insurance and guarantee in the fixed—price contract. In the fifth chapter, combined with engineering case, analysis the practical application of the engineering insurance and guarantee. In the sixth chapter, a forecasting and several suggestions are mentioned.The conclusion of the theme is that a reasonable use of engineering insurance and guarantee can effectively guard against the fixed—price risk in the process of contract implementation. This conclusion is based on the reasonable argument foundation.
|
Related Dissertations
- Study of Improving Engineering Insurance System in China,F842.6
- The Risk Analysis of Shield Tunneling Caused Settlement Loss and Its Utilization in Engineering Insurance,U455.43
- Research on the Risk Management of Road Construction Enterprise,F542
- Risk Research of Audience on the Major Sports Events,G80-05
- Studies on the Development Tactics of Construction Engineering Insurance in China,F842.6
- Risks Analysis on Project K of H Comperny,F224
- The Research of the BT Project Investment Control Based on the Risk Analysis,F224
- Study on the Contractor’s Risk Response Strategies under the Fixed-price Contract,F284
- Spectral Risk Measures of Financial Market Based on Kernel Density Estimation,F830.9
- Analysis of Investments Portfolio Model Based on Spectral Risk Measures,F830.59
- By Second Anteroom Loan New Deal under Chengdu Mortgage Present Situation and Risk Analysis,F832.4
- Measurement of the Copula function and CVaR method of risk,F830.9
- Houses for Sale in mortgage banking risk prevention system research,F293.3
- A Study on the Risk Control of Construction Enginnering Project After Insuring Contractor’s All Risks,F842.6
- The Analysis and Application of the Portfolio Model Based on CVaR,F224
- The Comparison and Empirical Research on Mean -CVaR and R-ratio Model in Risk Measurement,F830
- Burden of Proof in Engineering Insurance Litigation,D922.284
- The Jian'an engineering tender invitation signed a fixed price contract research,F284
- Engineering Insurance and the Construction Project Put Scheduled Time Risk Administration into Practice,F284
- Automotive Measurement of the Risk of Technological Innovation,F407.471;F273.1
- Research on Quality and Safety Risk Management of Construction Project,TU714
CLC: > Economic > Economic planning and management > Infrastructure the economy > Organization and management of infrastructure
© 2012 www.DissertationTopic.Net Mobile
|