Monitoring and Numerical Simulation of Construction Wall Rock on Super Section Multi-arch Tunnel
Author: YueQiXian
Tutor: HuoRunKe
School: Xi'an University of Architecture and Technology
Course: Bridge and Tunnel Engineering
Keywords: Four arched Dual sidewall guide pit ANSYS Monitoring and Measurement Numerical Analysis
CLC: U455.4
Type: Master's thesis
Year: 2011
Downloads: 65
Quote: 0
Read: Download Dissertation
Abstract
|
With the expansion of the city , urban traffic congestion has become one of the major issues facing the major cities . Underground railway project as an important part of the urban rail transport , with large volume , pollution does not affect ground transportation , etc. , by urban policy-makers of all ages . Shallow Soil Tunnel of Harbin subway Hanan Station ~ Academy of Agricultural Sciences station interval four arched segment belongs to a large cross-section , the use of double sidewall drift method for the construction , paper engineering for background on the different construction stages of surrounding rock deformation monitoring and numerical simulation analysis . Firstly, two-dimensional finite element analysis of the construction process of the project using ANSYS11.0 Software using Durcker-Prager yield criterion , to study dual sidewall drift method at different stages of construction surrounding rock deformation law obtained in the construction process stability and stress state of the surrounding rock and supporting structure . Study found that in the four - arch tunnel on the left and right side of the tunnel , as well as in the pilot tunnel construction process to produce a displacement of about 80 % ; parts of the vault and the arch of the tunnel surrounding rock stress concentrated area , most likely in this destruction; arching up and down the line and in the pilot tunnel dome part of the region σ1 four with a tensile stress phenomenon , but as the calculations are performed , the tensile stress gradually disappear , and force the state to improve . Second, the implementation XK1 450 sectional monitoring and measurement, analysis and monitoring results to collate . On surface subsidence , the analysis and judgment of the crown settlement and clearance convergence monitoring data , found that the deformation of surrounding rock from the tunnel face doubled Diameter within one to three times the hole diameter change rate decreases , three times the hole diameter stabilized later . Finally , by comparing the finite element analysis results and monitoring data results of the four arched tunnel deformation law is summarized .
|
Related Dissertations
- Pattern Classification of Combustion Modes in Scramjet,V235
- Analysis and Study of Abutment Stability in Concrete High Arch Dam by Three-Dimensional Nonlinear Finite Element Method,TV642.4
- The Effect of Current Density and Electric Field on Ni and Its Alloy Electrodeposition for Copper Crystallizer,TQ153.2
- Broken walnut shell force testing and virtual prototype design of the main components of walnut sheller,S226.4
- Research on a Fire-fighting Shell for Towers,TU892
- Electron Acceleration by Intense Laser in Vacuum,TN241
- Bearing Capacity of Cast-in-place Piles in the Karst Region of Yichun, Jiangxi,U213.1
- Structure Analysis and Optimization Design for 150 Tons Flat-Top Crane,TH213.3
- The Surrounding Rock Monitoring and Finite Element Simulation of Subway Tunnel,U455.43
- Numerical Simulation Research on Optimal Milli-second Delay Time with Many Free Surfaces Hole by Hole Blast,TD235
- Research of FBAR Temperature Sensor,TP212.11
- Safety Analysis for the Large-scale Silo,TU375
- The Study on the Influnce of Sub-splits Wire’s AC Corona Characristics under Different Climatic and Environmental Conditions,TM851
- Three-dimensional Thermal Simulation and Structure Design of Phase Change Access Random Memory,TP333.8
- Welding Research and Application of sump pumps based on the finite element analysis software,TG457.2
- Numeric Analysis Application of Periodic Structure Based on IE-MoM Method,TN011
- Simulation of infrared multispectral images,TP391.9
- Fabrication of Microscale Ordered-reinforced Composite and Its Mechanical Characterization,TB33
- Research and Experiment of Partial Mould Thermal Field Analysis Based on Induction Heating,TQ320.66
- Pipeline circumferential excitation calculation method of magnetic flux leakage,TG115.284
- Pipeline Leakage Detection Technology within the magnetic axis,TH878.3
CLC: > Transportation > Road transport > Tunnel project > Tunnel construction > Construction methods
© 2012 www.DissertationTopic.Net Mobile
|