Dissertation > Excellent graduate degree dissertation topics show
Risk Management on BOT Model in Urban Infrastructure Construction
Author: ZhaoShuZhen
Tutor: WangJianPing
School: Xi'an University of Architecture and Technology
Course: Civil engineering construction and management
Keywords: BOT model Urban infrastructure BP neural network model Risk research
CLC: F290
Type: Master's thesis
Year: 2010
Downloads: 298
Quote: 0
Read: Download Dissertation
Abstract
|
BOT model to solve the urban infrastructure construction in the government 's financial burden , single investment channels and high investor risk has been more widely used in the construction field . Because the BOT model many participants , the financing model is complex , in practical applications , there are still many problems , especially the risk of BOT projects . In recent years, the risks of the BOT projects for foreign investment projects , relatively little research risks for the domestic private capital to participate in the construction of urban infrastructure . Therefore, the strengthening of the risk study of the BOT model , establish a sound risk management system for private enterprises, private capital to participate in the construction of urban infrastructure plays a significant role in promoting . The paper describes the process of the emergence and development of the BOT model , summed up the domestic and foreign research on the BOT model and application status . The introduction of the privatization of urban investment and construction \Discusses the basic theory and methods of risk studies for BOT projects , the implementation of the various risks in the process , compared to the existing quantitative analysis methods , the establishment of a risk prediction model based on BP neural network . Through integrated analysis, the the BOT model the importance of risk , and provide a reference for the project risk managers better cope with risks . The paper through case studies, the collection and collation of relevant data on a BOT project risk , risk analysis and evaluation of the use of BP neural network prediction model , to verify the whole process of risk management , the risk responses , similar projects a reference for .
|
Related Dissertations
- Urban Infrastructure Investment Performance Evaluation Index System,F224
- Research on the Risk of Long-span Bridge’s Construction Project,U442
- Study on Issuing Local Treasury Bonds of China,F812.5
- The Instability Mechanism and Research of Deformation Prediction in Ding Jiafen Landslide,P642.22
- BT project ownership issues of urban infrastructure,F283
- Panzhihua city infrastructure finance platform,F283
- Model Construction and Empirical Study on Credit Risk Evaluation in Chinese Companies,F279.2
- The Research on the Project Cost Model of the Rural Highway in Hunan Province,F284
- Research and Implementation of Apple Diseases Intelligent Diagnosis System,S436.611
- Aero-engine altitude simulation test Risk Management,F426.5;F224
- Jinghuiqu irrigation water demand and water management analysis,S274.1
- Risk analysis and prevention of corporate sponsorship of sports events,G80-05
- Research of the Risk of Anhui SME Credit Guarantee Institutions,F832.39
- Research on Operation Feasibility of BT Projects about Nanxi County in Sichuan Province,F284
- Reseach on the Risk and Profit of the PPP Project,F299.24;F283
- Forecast of the Meiyu Rainfall in Yiwu City Based on BP Neural Network,P457
- Research on the Fixed Effects Model of Urban Infrastructure Service Level,F224
- The Early Warning Model of Listed Companies Financial Distress Based on MDA and BP Neural Network,F832.51;F275
- Research on the Removalefficiency of Hydrogen Sulfide from Biogas in the Biotrickling Filter,X701.3
- Study on Supply Chain Risk Warning of Iron and Steel Enterprise,F274;F224
- Liupanshui City highway construction project operation mode of study,F281
CLC: > Economic > Economic planning and management > Urban and municipal economy > Urban economic theory
© 2012 www.DissertationTopic.Net Mobile
|