Dissertation > Excellent graduate degree dissertation topics show

The Research of 110KV Substation Construction Project Management in the Hanjiang Group

Author: HuangWei
Tutor: RuShaoFeng
School: Northwestern University
Course: Business Administration
Keywords: Project Management WBS Process PERT&CPM
CLC: F426.61
Type: Master's thesis
Year: 2010
Downloads: 96
Quote: 0
Read: Download Dissertation

Abstract


The global economic crisis to the development of domestic enterprises has brought new challenges,Hanjiang Group of Danjiangkou City has strived to develop the internal hardware facilities,consolidate power infrastructure, in order to achieve the aggregation and sharing of resources of the three high-energy consumption industry on the expansion of the industrial chains,such as iron alloy, silicon carbide, calcium carbide, form the industrial variety and scale advantages,in order to achieve the above strategic objectives,to meet the needs of power consumption demand in the high energy consumption industries, the Hanjiang Group decided to invest more than 10 million yuan to construct a 110kV transformer substation.According to the Hanjiang Group in the project management methodology behind the existence of management, resulting in schedule delays, high costs,prone to such issues as safety and quality, in order to solve the problems in the management of Hanjiang Group,this paper set up the 110KV substation construction project of Hanjiang Group as the research object,start the study.This article firstly analyzed the problems that existed on the project management in the Hanjiang Group,and then made the acute analysis of the 110KV substation construction project management, finally made use of the PERT & CPM to decompose the project process,and arrange the process time, through analysis and calculation to find the project’s critical path, using the critical path to optimize the time of the project. To suggest the improvement method in project management of the Hanjiang Group and to solve problems on the Group’s project management, develop a quality management program for the project, project management program, project cost management programs,and project management, implementation of the program,promote the successful completion of the project.Through the 110KV substation construction project management research, and promoting the Hanjiang Group,the successful completion of 110KV substation in the 110KV substation project successfully completed, the substation of power supply can reach 780 million kilowatts per hour, the average annual income can be achieved 2 billion yuan to improve the economic benefits of the Hanjiang Group, to ensure high energy consumption enterprises, reliability and security of electricity for normal production of high energy consumption of enterprises laid a solid foundation. Through the research of the project management of the 110KV substation construction,to solve the problems in the project management of the Hanjiang Group and other project management in the future reference.

Related Dissertations

  1. Research on Dam-Break Probability Analysis Method for Dangerous Reservoir,TV697
  2. An Empirical Study of Contemporary Compehensive Urban Design in China,TU984
  3. Construction and improvement of basic education reform process evaluation platform,G521
  4. Implementation Study of evaluation method of the high school IT courses,G633.67
  5. The Design and Implementation of Security Mechanism of Embedded Dependable Computer,TP309
  6. Research on Evaluation of Simulation Systems Based on Fidelity,TP391.9
  7. Research and Application of Digital Assembly Process Planning System for Rocket Engine,TP391.7
  8. Research on Predictive Control and Simulation of pH Value Based on the Confection Process of Sodium Nitrate,TP273
  9. Process Support Vector Machine and Its Application to Satellite Thermal Equilibrium Temperature Prediction,TP183
  10. Study on Extracting Process of Rhizoma Alismatis and Rhizoma Smilacis Glabrae and Their Hypouricemic Effects,R284
  11. On Design of Process-based Collaborative Learning Environment,G434
  12. Research on Index System and Evaluation of University Office Greening,G647
  13. The Research of the Dynamic Process of Advertising Public Opinion,G206
  14. Effective Ways of Cultivating Design Thinking in the Teaching of Advanced Art Design,J50-4
  15. Analysis of Nutritional Compositions and Quality of Shishen (Eremurus Chinensis Fedtsch.),S647
  16. The Experimental Research on Regeneration Aggregate and Proportioning of Recycled Concrete Brick,TU528
  17. Dalian Waters Fire-fighting Forces Deployment Scheme Research,U698.4
  18. The Process Approach and English Writing Teaching in Vocational High Schools,G633.41
  19. The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
  20. Research and Design of One Kind of Paper’s QCS That Based on Embedded System,TP368.1
  21. Research and Implementation of the Conflict Resolution in Process Modeling of Magic Platform,TP311.5

CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net  Mobile