Dissertation > Excellent graduate degree dissertation topics show
Design and Implementation of University Scientific Research Project Middle and Late Period Management System
Author: LiuYaQin
Tutor: WangYuMing
School: Huazhong University of Science and Technology
Course: Communication and Information System
Keywords: Project Management Business Processes Control Finite State Machine WebDevelopment
CLC: TP311.52
Type: Master's thesis
Year: 2012
Downloads: 22
Quote: 0
Read: Download Dissertation
Abstract
|
The rapid development of network technology makes information-based managementcome into more widespread use. Information-based management can not only save costs,but also improve efficiency. In the field of university scientific research management,information-based management can accumulate data, gain management experience andimprove the quality of management. It can also promote information exchange, resourcesharing and scientific research development effectively.As the important work of university scientific research management, scientificresearch project management in the middle and late period will affect research results andresearch quality directly. However, both business management and data accumulation arecurrently still in the manual processing or semi-information processing status. This paperbuilds a management information-based system for actual needs of university scientificresearch project management in the middle and late period. Project management in themiddle and late period is the foundation and core of scientific research management and itsinformatization will support comprehensive informatization of university scientific researchmanagement.In this paper, in-depth investigation and research about various business and datainvolved in the university scientific research project middle and late period management areconducted, features of users at all levels and the relationship between users and variousbusiness processes involved in the system are also analyzed carefully, on the base of whichonline processing program of project management business in the middle and late period isdesigned. The business can be controlled based on finite state machine. Projectmanagement business in the middle and late period is audited level by level in the system.This mechanism makes business process more orderly and management process more open.It achieves that scientific research management person can supervise both process andresult of all kinds of business. In the business process, system according to different users,different business types and different business stages, provides different operations.Various business switches and transfers between different users according to actual needs.Business control is more accurate, flexible and user-friendly. Process control mechanismbased on finite state machine can fine control specific operations during businessprocessing in various stages and ensure that business can be handled properly. It has a high flexibility because it facilitates development when process changes. It is useful for smalland medium business process control. The system uses SSH framework based on JavaEEtechnology, with good scalability and maintainability. By the control of finite state machine,all project management business in the middle and late period, including mid-inspection,variation and end-inspection, can be handled in the system. Unified scientific researchproject middle and late period management of business and data is realized.
|
Related Dissertations
- An Empirical Study of Contemporary Compehensive Urban Design in China,TU984
- The Study of Project Management Theory’s Applying in Work of Communist Youth Leagur of Universities,D297
- Study on Top-post Internship Program Management in Vocational Colleges,G712.4
- Research on Building Teachers’ Team with Double Skilled Quality in Secondary Vocational Education Based on Project Management,G715.1
- Formalization-based Methed to Generate Test Sequence of UML,TP311.53
- Research on Agent Construction System Management Model of Highway Project,F283
- CNOOC Engineering Project Management Integrated System,F426.22
- Project management in new product development in the use of cigarettes,F426.8
- DAB company beverage freezer case study project operations management issues,F426.82
- EMU maintenance base in Guangzhou Project Management Research,F532
- Electric Power Construction Construction Management,TM73
- Chemical Construction Company Human Resource Management,F426.7
- Crude oil loading system transformation project management research,F284
- Five key research questions Chinese military physical examination of digital system design and its implementation,E917
- Project Quality Management in the Elevator Projects in the Application of,TU758.7
- DBF baseband data Simulator Design and Development,TN955
- Hardware Implementation of Block Ciphers Algorithm Based on Petri Net,TN918.2
- The Study on the Project Development and Management of Shenzhen Huiming Real Estate Co.Ltd,F293.3
- Research on Projects Management Model of Non-operating Government-invested Projects,F284
- Local Government Management of Public Investment Projects,F283
- Defence Research Model engineering project management model,F426.48
CLC: > Industrial Technology > Automation technology,computer technology > Computing technology,computer technology > Computer software > Program design,software engineering > Software Engineering > Software Development
© 2012 www.DissertationTopic.Net Mobile
|