This article according to State Grid Corporation "Centralize Three and Amplify Five" policy. It requires building up the "Amplify five" system in nearly 3 to 5 years’ time. State Grid corporation will comprehensively promote the management system and working mechanism innovation, change organizational structure, innovate management way, optimize the business process, implement enterprise management from intersected to synergetic unity, scattered to concentrated extensive fundamental shift of lean way in its planning, construction, operation, production, marketing and other major business areas.In this paper, I especially tall about the construction topic.In the construction area, this paper will implemented uniform construction standard, management process and technical specifications, strengthen the safety, quality, schedule and cost control as the breakthrough point, implementation of optimizing the existing power grid construction organization management mode, this thesis put forward to the significance of this subject and research orientations.This paper analyzed carefully electric project of construction planning, the present condition of construction, information technology and information management level, etc, puts forward to want to make the power grid construction "Amplifird Construction" purpose, focus is to promote the transformation of development mode grid infrastructure in order to deepen the standardized management system construction as the main line, unified management process, technical specifications and construction standards, promote the management of construction projects to corporately run by intersected change, from resources to optimize configuration change, scattered from extensive management to lean management changes. In this paper, focusing on current in the information management field transformation project within the existing problems and disadvantages to analyze, combined with engineering construction practice, put forward by means of information and network, with the construction management platform, based on power transmission project to solve in the subject, information management through the corresponding information management platform construction project management mode and correct the informationization level is low, low efficiency of management, collectivize management relatively weak, so as to improve the shortcomings of information management efficiency, strengthen project management of overall benefit, and to promote the improvement of engineering management level.The paper also based on the analysis of the problems and puts forward engineering information management platform the idea of construction and planning, combining engineering construction practice, the basic structure of formulated platform construction, complete with frame technology system and information management measures and improve the project information, improve complete coverage of project information collection, management and decision support, statistical series need, effective improve project management.
|