Research on Theory and Method of the Sequential Optimization of N Activity Pairs in the Condition of Resource Constrained

Author: SuZhiXiong
Tutor: QiJianXun
School: North China Electric Power University (Beijing)
Course: Technology Economics and Management
Keywords: Operations Research Project Management Schedule control Motor time
CLC: F224
Type: Master's thesis
Year: 2008
Downloads: 49
Quote: 1
Read: Download Dissertation

Abstract


Resource constraints project scheduling problem is the core content of the project management . Obvious defects existing analytical method and heuristic algorithms to solve this kind of problem , such as the calculation of large and difficult to achieve optimal lack of universality , etc. . First assumption resources in order to design a new algorithm to overcome the above drawbacks , unlimited \optimization sub - problem of the order of several parallel processes , reduce the difficulty of the work . In this paper, in which a class of sub-problems - 2N adjustment L parallel process for N of the order process . The CPM network characteristics and motor time law , in considering the subsequent process constraints , design a N- line with the amount of slack even order optimization algorithm, and analyze the time complexity of the algorithm . The sub - problems laid the foundation for a completely solve resource constraints project scheduling problem .

Related Dissertations

  1. An Empirical Study of Contemporary Compehensive Urban Design in China,TU984
  2. The Study of Project Management Theory’s Applying in Work of Communist Youth Leagur of Universities,D297
  3. Voluntary service project management of major sports events in China,G812
  4. Jiangmen Fixed Assets Investment Projects Research Project Management System,F283
  5. Risk Management Study of the GZ Paper Co,.LTD Moving and Transformation Project,F426.83
  6. Yuedian Practical Operation Base Project Cost and Schedule Control Model Construction and Use of,F426.61
  7. Schedule Management Research on Power Transmission and Transormation Project in Rizhao,F426.61
  8. The Project Management Research on Test Software Development of EV Company,F426.672
  9. The Design and Implementation of the real estate project management system,TP311.52
  10. Construction of the Dam Safety Monitoring Control Management,F224;F293.3
  11. Risk Management of Customized Development on ERP Financial Module for H Bank’s Customer,F232
  12. A Research on the Schedule Management of X Nuclear Power Project,F426.23;F426.61
  13. Multi Functional Digital X-ray Imaging System Research and Development of Risk Management Research,F426.4
  14. State Road 112, Five-line High-speed Adjustment of the Contract on the Project Schedule and Control,F542
  15. Study on the Application of the Critical Chain Project Management in Non-Standard Equipment Manufacture Projects,F224
  16. DG Mobile Communications Construction Project Risk Management,F626
  17. FY company information technology project management case studies,F426.61
  18. Company F IPD project management application of the implementation process,F426.6
  19. V Auto Parts Company Project Cost Management,F426.4
  20. Automotive Electronic Control R \u0026 D Project Risk Management,F426.63
  21. Shan Wei drag ERP implementation and control of risk analysis,F270.7;F426.4

CLC: > Economic > Economic planning and management > Economic calculation, economic and mathematical methods > Economic and mathematical methods
© 2012 www.DissertationTopic.Net  Mobile