Dissertation > Excellent graduate degree dissertation topics show

Project Management System for Research and Design Based on the INTRANET

Author: GaoZiPing
Tutor: JiangZhanHua
School: Jilin University
Course: Software Engineering
Keywords: Project Management Design Patterns Software Engineering
CLC: TP311.52
Type: Master's thesis
Year: 2008
Downloads: 78
Quote: 2
Read: Download Dissertation

Abstract


With the deepening of economic reform, the prospects for the development of various sectors and broader space. Investment projects in the form of standardized information management, information transmission, as well as standardization of systematic information, information resources, networking and sharing a high degree of investment is to make full use of management information system is an inevitable trend. The management of investment projects in the field of application is the most extensive, direct and obvious. China every year a few trillion of investment for the project management provides a broader space for development. Over the past two years, especially in the First China International Conference on Project Management, the community "project management" to become more calm on the surface, from simple concern to learn Project Management Body of Knowledge into a comprehensive enterprise applications and in-depth practice, and to seek practical The project management solutions. At present, as China’s economy continued high growth and control excessive investment in fixed assets, especially blind investment in certain industries to control low-level expansion of the current focus on the need to address the overall good relations. Implementation of the project should be a process so that the process of customer satisfaction, in the process, it is necessary to maintain adequate communication with customers, in order to deepen understanding of customer needs, access to customer support. In order to build a high-level management, high-yield, high efficiency of modern enterprises, Jilin branch of China Netcom in 2005 from the start in the province-wide implementation of the system construction project management, design and development of project management systems, decided to adopt the systemC/ S or the structure of B / S structure. Use of B / S and C / S mixed structure for the following reasons: B / S and C / S mixed software architecture is a typical heterogeneous architecture. B / S software architecture, that is, Browser / Server (B / S) structure, with the rise of Internet technology, C / S architecture of a change or improve the structure. In the B / S architecture, user interface through the full realization of WWW browser, part of the logic of affairs in the front-end to achieve, but in the main server-side logic to achieve.B / S architecture is the main advantage of maturing WWW browser technology, combined with a variety of browser scripting language, using a standard Web browser on the need for the realization of the original complex software in order to achieve the power and save development costs, Is a new software architecture. Based on B / S architecture of the software, installation, modification and maintenance in the server-side solution to the whole. Users to use the system only requires a browser can run all the modules, the real reached a "zero client" function, it is easy to run automatically upgrade. B / S architecture also provides a heterogeneous, heterogeneous network of heterogeneous applications on-line services, networking, unified services of the most open and realistic basis. However, with the C / S architecture compared to, B / S architecture and there are many shortcomings, such as:(1) B / S architecture of a lack of ability to support dynamic pages, there is no effective integration of the database processing functions.(2) B / S architecture of the system to expand capacity of poor security is difficult to control.(3) B / S architecture applications, such as in data query response time, is much lower than the C / S architecture.(4) B / S architecture of the data submitted to the General page as a unit, the dynamic interactive data is not strong, not conducive to on-line transaction processing (OLTP) applications.From the above comparative analysis, we can see that the traditional C / S architecture was not completely useless, and the new B / S architecture is not perfect. As the C / S architecture of deep-rooted, mature technology, many of the original software system is built on the C / S, based on the architecture, so, B / S architecture in software development in order to play a leading role, way to go Is still very long. C / S Architecture and B / S architecture will also be long-term coexistence. So, Jilin Communications human resources information-based software platform used to B / S and C / S mixed structure. To sum up, in order to meet the requirements of the telecom industry project management, project to promote the effective application of the telecommunications industry at the same time further enhance the efficiency of the office and office automation level, more timely and more easily understand the content of the enterprise and external telecommunications industry information more effectively The use of information resources platform, so that the leadership of the decision-making more scientific and more timely, we have service-oriented architecture (SOA) integrated control of the multi-business platform (BOS). The platform for the telecommunications industry sector units to achieve large-scale investment project management and design development in the telecommunications business for the investment to save costs, increase efficiency and reduce investment risk and improve returns on investment. "Comprehensive management, comprehensive control, the overall supervision" by the project as a platform carrier material to the contract (money) management integration, management and control to achieve integration.

Related Dissertations

  1. An Empirical Study of Contemporary Compehensive Urban Design in China,TU984
  2. The Study of Project Management Theory’s Applying in Work of Communist Youth Leagur of Universities,D297
  3. Study on Top-post Internship Program Management in Vocational Colleges,G712.4
  4. Research on Building Teachers’ Team with Double Skilled Quality in Secondary Vocational Education Based on Project Management,G715.1
  5. Research on Agent Construction System Management Model of Highway Project,F283
  6. CNOOC Engineering Project Management Integrated System,F426.22
  7. Project management in new product development in the use of cigarettes,F426.8
  8. DAB company beverage freezer case study project operations management issues,F426.82
  9. EMU maintenance base in Guangzhou Project Management Research,F532
  10. Electric Power Construction Construction Management,TM73
  11. Chemical Construction Company Human Resource Management,F426.7
  12. Crude oil loading system transformation project management research,F284
  13. Existing Problems in College Entrepreneurial Education Project and Countermeasures,G647.38
  14. Voluntary service project management of major sports events in China,G812
  15. Design and Implementation of the Billing System of a Game Company,TP311.52
  16. The Project Management Research of Library Cataloging Outsourcing of University Library,G254.3
  17. Caofeidian Heavy Equipment Plant Project Schedule Management Research,TU722
  18. The Research on Quality management of Soft Furiture Production Project,F273.2
  19. The Dongqi reconstruction of major projects in the process control,F426.471
  20. Research on Project Organizational in a Small Private High-tech Company,F276.44
  21. Project Management Maturity Model and Assessment for Training Program in GS Insurance Company,F840.3

CLC: > Industrial Technology > Automation technology,computer technology > Computing technology,computer technology > Computer software > Program design,software engineering > Software Engineering > Software Development
© 2012 www.DissertationTopic.Net  Mobile