Research of Object Controlling in Engineering Project Management of Hu-Zhun Railway Construction

Author: ZhengBiFang
Tutor: ShiBenShan
School: Southwest Jiaotong University
Course: Industrial Engineering
Keywords: Hu-zhun Railway project management object controlling
CLC: F532
Type: Master's thesis
Year: 2005
Downloads: 223
Quote: 2
Read: Download Dissertation

Abstract


Hu-zhun Railway construction as a case is researched in the article. Based on controlling theory of engineering project management, the controlling problems of organization and group, cost, schedule, quality and risk are analyzed detailed to the practical extent, available methods are put forward, and effective object management of Hu-zhun Railway construction is realized.Organization and group controlling of Hunzhun Railway are analyzed firstly in the article. Reasonable project management mode is important. Conditions, requirement and environment are considered to equip and arrange project managers and workers.Factors, including quality, schedule, material, manpower, influence cost of Hu-zhun Railway complexly, so duty-cost management and warp controlling are introduced to control cost. Duty-cost management is a effective means to enhance cost controlling, carrying out cost responsibility and reduce cost.Schedule of Hu-zhun Railway is affected by lots of factors, including design, cash flow, and weather. A way of consolidation Gantt graphics and network plan graphics are taken to control schedule, which can master engineering time roundly, find problems and resolve them.Quality of Hu-zhun Railway is influenced by some factors such as manpower, material, design, construction and machine. Cause-Effect Graphics is taken to analyzed quality problems, which is a main method to ensure the quality of Hu-zhun Railway.Risk management of Hu-zhun Railway is very necessary, including risk identification, risk evaluation and dealing with. The three aspects is so important that they must be recognized. Controlling risk factors influencing Hu-zhun Railway construction effectively is to avoid their negative influences.Only controlling the objects of group, cost, schedule, quality and risk effectively can assure that Hu-zhun Railway construction develops and finishes successfully. At the same time, the successful methods of Hu-zhun Railway can be

Related Dissertations

  1. An Empirical Study of Contemporary Compehensive Urban Design in China,TU984
  2. The Study of Project Management Theory’s Applying in Work of Communist Youth Leagur of Universities,D297
  3. Study on Top-post Internship Program Management in Vocational Colleges,G712.4
  4. Research on Building Teachers’ Team with Double Skilled Quality in Secondary Vocational Education Based on Project Management,G715.1
  5. Research on Agent Construction System Management Model of Highway Project,F283
  6. CNOOC Engineering Project Management Integrated System,F426.22
  7. Project management in new product development in the use of cigarettes,F426.8
  8. DAB company beverage freezer case study project operations management issues,F426.82
  9. EMU maintenance base in Guangzhou Project Management Research,F532
  10. Electric Power Construction Construction Management,TM73
  11. Chemical Construction Company Human Resource Management,F426.7
  12. Crude oil loading system transformation project management research,F284
  13. Existing Problems in College Entrepreneurial Education Project and Countermeasures,G647.38
  14. Voluntary service project management of major sports events in China,G812
  15. The Project Management Research of Library Cataloging Outsourcing of University Library,G254.3
  16. Caofeidian Heavy Equipment Plant Project Schedule Management Research,TU722
  17. Heilongjiang Unicom WCDMA network project schedule management research,F626
  18. A Fuzzy Earned Value Method Based on Quality Factor,F284
  19. Research on Planing and Construction of BF Company "NET-5M" Training Project,F272.92
  20. Optimization Research for the Patterns and Technological Process of Home Decoration,TU767
  21. The Research on Quality management of Soft Furiture Production Project,F273.2

CLC: > Economic > Transportation and economic > Rail transport and economic > China 's railway transport economics
© 2012 www.DissertationTopic.Net  Mobile