Dissertation > Excellent graduate degree dissertation topics show

Research on Project Management Application in Hgst (Shenzhen) VMI Business Integration

Author: LeiBin
Tutor: LiXiang;LeiHong
School: Shanghai Jiaotong University
Course: Project Management
Keywords: Project management HGST-VMI business integration projects HGST-VMI Project Management
CLC: F272
Type: Master's thesis
Year: 2010
Downloads: 30
Quote: 0
Read: Download Dissertation

Abstract


Project management on project management for the target system through a temporary flexible organization dedicated,high-efficiency of project planning, organization, direction and control to achieve the dynamic process and project management and project objectives comprehensive coordination and optimization. The so-called whole process to achieve the dynamic management of the project refers to the project’s life cycle, keep the configuration of resources, constantly make scientific, so that the whole process of project is in the best running state and produces the optimal results .To protect the HGST Shenzhen VMI smooth implementation of business integration projects, HGST Shenzhen set up a special group of VMI business integration projects to systematically promote the HGST Shenzhen VMI business integration project. On the one hand, the project team has made the cost and adequacy of the project strategy analysis and assessment of the implementation of the project preparation, implementation of operating rules, the implementation of quality assessment and management plan and risk management and avoidance were well prepared for such . On the other hand, the project manager and project team of the joint efforts, HGST Shenzhen has identified logical relationship between the activities and sequencing, and the estimated duration of activities to prevent the implementation of the project activities, omissions or other changes. Although HGST Shenzhen VMI business integration projects have been built more systematic project management model, but so far, HGST Shenzhen VMI business integration projects did not achieve the desired results, its implementation plan failed systematically. The reason for such a problem, its root cause is there are many specific issues in HGST Shenzhen VMI business integration project management process. We need to further optimize and design HGST-VMI business integration project management systemFor the actual situation of HGST (Shenzhen) VMI integration project and issues existing in current project management, HGST-VMI business integration project in the project management system includes three levels: the project process management system , content management system and implementation of protection mechanism.HGST-VMI business integration project content management system is the core of HGST-VMI business integration projects in the project management system,including project schedule management,project quality management, project organizational management,project risk management,and thus construct comprehensive,scientific,systematic project management model and implementation of security strategies containing the project schedule management,project quality management,project organizational management,project risk management,etc., so as to HGST (Shenzhen)VMI smooth implementation of the integration project to provide a theoretical framework and practical operation of mechanisms.It’s helpful for HGST (Shenzhen) integration of project management VMI overall cost of the logistics of long-term savings and effective control, operational efficiency improvement, and operational risk reduction to get the final optimization of VMI business operations in Shenzhen and the overall objectives of the program.

Related Dissertations

  1. An Empirical Study of Contemporary Compehensive Urban Design in China,TU984
  2. The Study of Project Management Theory’s Applying in Work of Communist Youth Leagur of Universities,D297
  3. Study on Top-post Internship Program Management in Vocational Colleges,G712.4
  4. Research on Building Teachers’ Team with Double Skilled Quality in Secondary Vocational Education Based on Project Management,G715.1
  5. Research on Agent Construction System Management Model of Highway Project,F283
  6. Existing Problems in College Entrepreneurial Education Project and Countermeasures,G647.38
  7. Voluntary service project management of major sports events in China,G812
  8. The Project Management Research of Library Cataloging Outsourcing of University Library,G254.3
  9. The Design and Implementation of the consultancy enterprise project management system,TP311.52
  10. Based Net of a unit of research project management information system design and implementation,TP311.52
  11. The Research and Development of Project Management System for Financial Equipment Industry Based on PDM,TP311.52
  12. Study on Project Management in Outsourcing of Cleaning Service,F719
  13. Design and Implementation of CNPC Northwest sales logistics operation monitoring system,F426.22;F252
  14. Research on EPC Management of Hydropower Projects,TV512
  15. Research on Resource-constrained Project Scheduling with Critical Chain for Multi-project,F272
  16. Multi-Objective Optimization Research on Construction Project Management,TU71
  17. Risk Mangement Theory and Empirical Research on Project of Telecommunication Station,TU71
  18. Agile Project Management Software to Realize and Document Retrieval Project Agile Practice,TP311.52
  19. Research and Application on Management of Outsourcing Projects Based on Function Point Analysis,TP311.52
  20. The Study on the Marine Engineering Production Cost Control Method Based on Project Management Technology,F406.72
  21. Telecom card advertising media placement management project research and practice,F713.8

CLC: > Economic > Economic planning and management > Enterprise economy > Enterprise planning and management decision - making
© 2012 www.DissertationTopic.Net  Mobile